IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 2335 Women's, Misses', and Juniors' Dresses
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0254 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,096 $991 Implemented
MO0254 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,160 $26,000 Implemented
MO0254 # 07 Y:1999 07 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $535 $3,800 Implemented
MO0254 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,319 $24,516 Implemented
TN0550 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $702 $334 Implemented
TN0550 # 03 Y:1995 03 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $401 $0 Implemented
TN0550 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $970 $620 Implemented
TN0550 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $1,688 $800 Implemented
TN0365 # 01 Y:1989 01 1989 KEEP BOILER TUBES CLEAN $1,406 $320 Implemented
TN0365 # 02 Y:1989 02 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $503 $447 Implemented
TN0365 # 03 Y:1989 03 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $431 $225 Implemented
TN0365 # 04 Y:1989 04 1989 USE MINIMUM STEAM OPERATING PRESSURE $384 $0 Implemented
TN0365 # 05 Y:1989 05 1989 INSULATE BARE EQUIPMENT $223 $270 Implemented
TN0365 # 06 Y:1989 06 1989 CLOSE OFF UNNEEDED STEAM LINES $118 $210 Implemented
TN0365 # 07 Y:1989 07 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $95 $1,700 Implemented
TN0365 # 08 Y:1989 08 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $334 $250 Implemented
TN0365 # 09 Y:1989 09 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $294 $0 Implemented
TN0365 # 10 Y:1989 10 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,100 $616 Implemented
TN0365 # 11 Y:1989 11 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $38 $30 Implemented
ST0064 # 10 Y:1986 10 1986 INSTALL TIMERS AND/OR THERMOSTATS $6,774 $2,100 Implemented
ST0064 # 08 Y:1986 08 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $526 $627 Implemented
ST0064 # 07 Y:1986 07 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,137 $5,000 Implemented
ST0064 # 06 Y:1986 06 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $12,081 $0 Implemented
ST0064 # 01 Y:1986 01 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,167 $0 Implemented