Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
209
matching recommendationsSIC | 238 | Miscellaneous Apparel And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2503 # 04 Y:2025 | 04 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,722 | $482,406 | n/a |
UL2503 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,129 | $32,120 | n/a |
UL2503 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,739 | $14,223 | n/a |
UL2503 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,094 | $7,500 | n/a |
UL2503 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,701 | $2,100 | n/a |
UU0246 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $439 | $900 | Not Implemented |
UU0246 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,731 | $338 | Implemented |
UU0246 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $8,970 | $42,406 | Implemented |
UU0246 # 07 Y:2024 | 07 | 2024 | USE AUTOMATIC FLOW CONTROL | $4,727 | $4,633 | Not Implemented |
UU0246 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $520 | $123 | Implemented |
UU0246 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $3,514 | $9,000 | Implemented |
UU0246 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,628 | $3,000 | Implemented |
UU0211 # 04 Y:2023 | 04 | 2023 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $3,351 | $26,250 | Implemented |
UU0211 # 06 Y:2023 | 06 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $433 | $3,100 | Not Implemented |
UU0211 # 03 Y:2023 | 03 | 2023 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $7,263 | $12,600 | Not Implemented |
UU0211 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,330 | $6,230 | Not Implemented |
UU0211 # 02 Y:2023 | 02 | 2023 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $22,030 | $18,300 | Not Implemented |
UU0211 # 01 Y:2023 | 01 | 2023 | REPLACE BOILER | $24,600 | $111,300 | Implemented |
SF0588 # 05 Y:2022 | 05 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $28,848 | $137,044 | Not Implemented |
SF0588 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $621 | $1,515 | Implemented |
SF0588 # 01 Y:2022 | 01 | 2022 | INSULATE BARE EQUIPMENT | $8,477 | $5,558 | Implemented |
SF0588 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,344 | $4,967 | Implemented |
SF0588 # 04 Y:2022 | 04 | 2022 | COMBINE UTILITY METERS | $7,304 | $15,000 | Not Implemented |
DL0199 # 03 Y:2021 | 03 | 2021 | REPAIR FAULTY LOUVERS AND DAMPERS | $2,440 | $2,275 | Not Implemented |
DL0199 # 10 Y:2021 | 10 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,675 | $7,837 | Not Implemented |