IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
SIC 2394 Canvas And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0244 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,493 $9,500 Not Implemented
SD0244 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $977 $0 Implemented
SD0244 # 05 Y:2000 05 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $136,408 $57,000 Implemented
SD0244 # 06 Y:2000 06 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $61,500 $103,000 Not Implemented
SD0244 # 07 Y:2000 07 2000 CHANGE OPERATING CONDITIONS $2,333 $0 Not Implemented
SD0244 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,164 $8,784 Not Implemented
AR0158 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,328 $1,000 Not Implemented
AR0158 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,718 $80 Not Implemented
AR0158 # 03 Y:1999 03 1999 ADJUST BURNERS FOR EFFICIENT OPERATION $13,533 $1,000 Not Implemented
AR0158 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,831 $0 Not Implemented
AR0158 # 05 Y:1999 05 1999 INSTALL SENSORS TO DETECT DEFECTS $63,302 $6,700 Not Implemented
AR0158 # 06 Y:1999 06 1999 AUTOMATE FINISHING PROCESS $24,235 $45,000 Not Implemented
AR0158 # 07 Y:1999 07 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $0 $2,000 Not Implemented
MA0424 # 03 Y:1998 03 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,197 $21,808 Not Implemented
MA0424 # 01 Y:1998 01 1998 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $263,073 $1,000,000 Not Implemented
MA0424 # 02 Y:1998 02 1998 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $16,538 $30,400 Implemented
MA0424 # 04 Y:1998 04 1998 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $12,411 $10,638 Not Implemented
MA0424 # 06 Y:1998 06 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,474 $5,800 Not Implemented
MA0424 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,568 $0 Implemented
MO0220 # 07 Y:1997 07 1997 USE RE-USABLE FILTERS $1,648 $2,231 Not Implemented
MO0220 # 06 Y:1997 06 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $7,800 $3,040 Implemented
MO0220 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $76 $0 Implemented
MO0220 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $39 $51 Implemented
MO0220 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $516 $80 Implemented
MO0220 # 02 Y:1997 02 1997 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $8,000 $15,000 Implemented