Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

87

matching recommendations
Reset
SIC 2396 Automotive And Apparel Trimmings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0014 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,680 $4,307 Implemented
MU0014 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,023 $0 Implemented
MU0014 # 08 Y:2022 08 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $109 $0 Implemented
AM0795 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $3,600 $35 Implemented
AM0795 # 05 Y:2020 05 2020 PAY UTILITY BILLS ON TIME $1,105 $0 Implemented
AM0795 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,426 $1,000 Implemented
TR0021 # 03 Y:2020 03 2020 USE MECHANICAL STRIPPING METHODS $2,731 $666 Implemented
TR0021 # 02 Y:2020 02 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $35,728 $7,275 Implemented
CL1907 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,969 $31,130 Implemented
CL1907 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $1,280 $131 Implemented
CL1907 # 05 Y:2019 05 2019 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $3,950 $2,962 Implemented
CL1907 # 01 Y:2019 01 2019 PAY BILLS ON TIME TO AVOID LATE FEES $4,250 $4,250 Implemented
NC0623 # 04 Y:2018 04 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,478 $16,800 Implemented
NC0623 # 03 Y:2018 03 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $2,320 $1,203 Implemented
NC0623 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,801 $500 Implemented
NC0623 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,322 $900 Implemented
IP0069 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $9,327 $377 Implemented
IP0069 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $231 $351 Implemented
IP0069 # 06 Y:2016 06 2016 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,989 $215 Implemented
IP0069 # 07 Y:2016 07 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $27,384 $7,218 Implemented
IP0069 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,756 $4,316 Implemented
IP0069 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,282 $21 Implemented
IP0069 # 01 Y:2016 01 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $490 $0 Implemented
TT0128 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $125 $180 Implemented
TT0128 # 01 Y:2014 01 2014 DISCONNECT BALLASTS $293 $0 Implemented