IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
Reset
SIC 2396 Automotive And Apparel Trimmings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0623 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,801 $500 Implemented
NC0623 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,322 $900 Implemented
NC0623 # 04 Y:2018 04 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,478 $16,800 Implemented
NC0623 # 05 Y:2018 05 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $14,884 $10,000 Not Implemented
IP0069 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,282 $21 Implemented
IP0069 # 12 Y:2016 12 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,955 $38,395 Not Implemented
IP0069 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $231 $351 Implemented
IP0069 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,756 $4,316 Implemented
IP0069 # 09 Y:2016 09 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,712 $1,271 Not Implemented
IP0069 # 08 Y:2016 08 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $22,750 $12,163 Not Implemented
IP0069 # 07 Y:2016 07 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $27,384 $7,218 Implemented
IP0069 # 06 Y:2016 06 2016 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,989 $215 Implemented
IP0069 # 05 Y:2016 05 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $50 $5 Not Implemented
IP0069 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $9,327 $377 Implemented
IP0069 # 03 Y:2016 03 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,637 $3 Not Implemented
IP0069 # 01 Y:2016 01 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $490 $0 Implemented
TT0128 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $1,294 $1,550 Implemented
TT0128 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $125 $180 Implemented
TT0128 # 06 Y:2014 06 2014 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $598 $2,350 Implemented
TT0128 # 01 Y:2014 01 2014 DISCONNECT BALLASTS $293 $0 Implemented
TT0128 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,860 $15,980 Implemented
TT0128 # 07 Y:2014 07 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,636 $18,000 Not Implemented
TT0128 # 08 Y:2014 08 2014 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $15,563 $110,000 Not Implemented
TT0128 # 05 Y:2014 05 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $14,016 $23,710 Implemented
UA0103 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $13,561 $150 Implemented