Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
171
matching recommendationsSIC | 2396 | Automotive And Apparel Trimmings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0286 # 08 Y:2007 | 08 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $519 | $798 | Implemented |
UF0321 # 01 Y:2003 | 01 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,390 | $2,948 | Not Implemented |
UF0321 # 02 Y:2003 | 02 | 2003 | INSULATE BARE EQUIPMENT | $1,530 | $868 | Not Implemented |
UF0321 # 03 Y:2003 | 03 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $17,331 | $45,500 | Implemented |
UF0321 # 04 Y:2003 | 04 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,451 | $740 | Not Implemented |
UF0321 # 05 Y:2003 | 05 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,598 | $376 | Not Implemented |
UF0321 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,755 | $852 | Not Implemented |
UF0321 # 07 Y:2003 | 07 | 2003 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $15,954 | $436 | Implemented |
UF0321 # 08 Y:2003 | 08 | 2003 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $18,000 | $4,000 | Implemented |
MI0006 # 01 Y:2001 | 01 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,105 | $2,513 | Not Implemented |
MI0006 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,467 | $333 | Not Implemented |
MI0006 # 03 Y:2001 | 03 | 2001 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $16,244 | $2,084 | Not Implemented |
MI0006 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,608 | $312 | Not Implemented |
MI0006 # 05 Y:2001 | 05 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $22,646 | $7,000 | Not Implemented |
MI0006 # 06 Y:2001 | 06 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,215 | $1,126 | Not Implemented |
MI0006 # 07 Y:2001 | 07 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $120,000 | $44,200 | Not Implemented |
GT0714 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $630 | $250 | Implemented |
GT0714 # 02 Y:2001 | 02 | 2001 | MINIMIZE WATER USAGE | $26,061 | $350 | Not Implemented |
GT0714 # 03 Y:2001 | 03 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,570 | $0 | Not Implemented |
GT0714 # 04 Y:2001 | 04 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,100 | $138 | Not Implemented |
GT0714 # 05 Y:2001 | 05 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $98,120 | $175,000 | Implemented |
MA0476 # 01 Y:2000 | 01 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $109,000 | $720,000 | Not Implemented |
MA0476 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,750 | $50,000 | Not Implemented |
MA0476 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,100 | $24,000 | Implemented |
MA0476 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,130 | $1,000 | Implemented |