IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

117

matching recommendations
Reset
SIC 2399 Fabricated Textile Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0365 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,747 $15,590 Implemented
MS0365 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $196 Implemented
MS0365 # 01 Y:2010 01 2010 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $42,353 $102,915 Not Implemented
MS0365 # 02 Y:2010 02 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,482 $217,200 Not Implemented
MS0365 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,112 $38,096 Implemented
MS0341 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,482 $217,200 Not Implemented
MS0341 # 01 Y:2009 01 2009 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $42,353 $102,915 Not Implemented
MS0341 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,112 $38,096 Implemented
MS0341 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,747 $15,590 Implemented
MS0341 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $196 Implemented
MS0292 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,405 $231 Implemented
MS0292 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,311 $46,268 Implemented
MS0292 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,743 $34,278 Implemented
MS0292 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,836 $21,282 Implemented
MS0292 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $953 $753 Not Implemented
NC0328 # 06 Y:2005 06 2005 USE PHOTOCELL CONTROLS $115 $165 Implemented
NC0328 # 04 Y:2005 04 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $10,481 $3,035 Not Implemented
NC0328 # 02 Y:2005 02 2005 BURN A LESS EXPENSIVE GRADE OF FUEL $113,412 $10,000 Not Implemented
NC0328 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $11,962 $7,002 Not Implemented
NC0328 # 01 Y:2005 01 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $8,068 $6,225 Not Implemented
NC0328 # 05 Y:2005 05 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $11,954 $480 Implemented
IC0012 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $159 $245 Not Implemented
IC0012 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,581 $24,034 Not Implemented
IC0012 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $996 $2,273 Not Implemented
IC0012 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,736 $2,070 Not Implemented