IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,421

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0035 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $899 $5,448 Implemented
UA0035 # 07 Y:2009 07 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $3,983 $2,478 Implemented
UA0035 # 08 Y:2009 08 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $129,337 $0 Implemented
UA0035 # 09 Y:2009 09 2009 INSTALL TIMERS AND/OR THERMOSTATS $3,810 $2,210 Implemented
UA0035 # 10 Y:2009 10 2009 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $40,375 $77,000 Implemented
AM0557 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,870 $400 Implemented
TT0032 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,170 $2,500 Implemented
WV0386 # 01 Y:2008 01 2008 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $140,425 $517,666 Implemented
WV0386 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $4,653 $920 Implemented
WV0386 # 07 Y:2008 07 2008 DEVELOP A REPAIR/REPLACE POLICY $2,823 $769 Implemented
WV0386 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,790 $0 Implemented
WV0386 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,379 $396 Implemented
WV0386 # 10 Y:2008 10 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,621 $1,000 Implemented
WV0386 # 11 Y:2008 11 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,548 $50 Implemented
WV0386 # 12 Y:2008 12 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $884 $1,000 Implemented
UF0416 # 01 Y:2008 01 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $950 $4,000 Implemented
UF0416 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70,300 $53,500 Implemented
UF0416 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,217 $0 Implemented
UF0416 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,708 $1,477 Implemented
OR0537 # 06 Y:2008 06 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,113 $0 Implemented
OR0533 # 01 Y:2008 01 2008 REDUCE SCRAP PRODUCTION $34,537 $0 Implemented
OR0533 # 05 Y:2008 05 2008 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $8,300 $2,500 Implemented
UM0340 # 01 Y:2008 01 2008 OPTIMIZE PLANT POWER FACTOR $15,424 $32,000 Implemented
UM0340 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $329 $500 Implemented
WV0381 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,296 $19,992 Implemented