Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0439 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,905 | $81 | Implemented |
IA0439 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $741 | $469 | Implemented |
IA0439 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $662 | $1,585 | Implemented |
DS0168 # 05 Y:2000 | 05 | 2000 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,115 | $6,647 | Implemented |
DS0168 # 04 Y:2000 | 04 | 2000 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $871 | $511 | Implemented |
DS0166 # 01 Y:2000 | 01 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,974 | $251 | Implemented |
DS0166 # 08 Y:2000 | 08 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $30,210 | $80,000 | Implemented |
DS0166 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,511 | $500 | Implemented |
DS0151 # 01 Y:2000 | 01 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $4,672 | $192 | Implemented |
DS0151 # 03 Y:2000 | 03 | 2000 | APPLY FOR INVESTMENT INCENTIVES | $709 | $400 | Implemented |
IA0225 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,393 | $381 | Implemented |
IA0225 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $988 | $0 | Implemented |
IA0225 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $265 | $189 | Implemented |
IA0225 # 06 Y:1999 | 06 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $183 | $13 | Implemented |
DS0061 # 05 Y:1996 | 05 | 1996 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $4,951 | $4,500 | Implemented |
DS0061 # 06 Y:1996 | 06 | 1996 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $9,242 | $2,400 | Implemented |
DS0061 # 04 Y:1996 | 04 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,120 | $11,350 | Implemented |
DS0061 # 03 Y:1996 | 03 | 1996 | OPTIMIZE PLANT POWER FACTOR | $2,466 | $1,050 | Implemented |
DS0061 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $854 | $200 | Implemented |
DS0061 # 01 Y:1996 | 01 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $993 | $2,300 | Implemented |
DS0005 # 01 Y:1994 | 01 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $986 | $3,642 | Implemented |
DS0005 # 10 Y:1994 | 10 | 1994 | REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS | $1,640 | $3,800 | Implemented |
DS0005 # 05 Y:1994 | 05 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,476 | $1,350 | Implemented |
DS0005 # 04 Y:1994 | 04 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $329 | $132 | Implemented |