Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,261
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1107 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $412 | $900 | n/a |
UD1107 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $69,274 | $0 | n/a |
UD1107 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,345 | $953 | n/a |
UD1107 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $228,685 | $136,500 | n/a |
UD1107 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,839 | $5,280 | n/a |
AS0600 # 01 Y:2025 | 01 | 2025 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $274,416 | $2,377,539 | n/a |
AS0600 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,289 | $15,555 | n/a |
AS0600 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,872 | $274,416 | n/a |
AS0600 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,357 | $495 | n/a |
AS0600 # 07 Y:2025 | 07 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $312 | $279 | n/a |
AS0600 # 06 Y:2025 | 06 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,132 | $39 | n/a |
AS0600 # 03 Y:2025 | 03 | 2025 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $8,750 | $276 | n/a |
NT0036 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,972 | $5,609 | n/a |
NT0036 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,825 | $0 | n/a |
NT0036 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,170 | $16,268 | n/a |
NT0036 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $688 | $0 | n/a |
OR0801 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $15,143 | $44,093 | n/a |
OR0801 # 02 Y:2024 | 02 | 2024 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $42,000 | $50,000 | n/a |
OR0801 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,786 | $5,438 | n/a |
OR0801 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,400 | $6,763 | n/a |
OR0801 # 01 Y:2024 | 01 | 2024 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $1,848 | $0 | n/a |
OR0801 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,884 | $92,435 | n/a |
DL0245 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,089 | $9,630 | n/a |
DL0245 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,536 | $53,470 | n/a |
DL0245 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,607 | $6,000 | n/a |