Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
139
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0464 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,786 | $3,794 | Implemented |
UM0464 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $361 | $2,000 | Not Implemented |
UM0464 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,842 | $5,500 | Not Implemented |
UM0464 # 04 Y:2016 | 04 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $736 | $150 | Implemented |
UM0464 # 05 Y:2016 | 05 | 2016 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,107 | $7,900 | Implemented |
UD0915 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,815 | $100 | Implemented |
UD0915 # 11 Y:2014 | 11 | 2014 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $7,301 | $0 | Not Implemented |
UD0915 # 07 Y:2014 | 07 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $993 | $2,575 | Not Implemented |
UD0915 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $129,321 | $377,745 | Not Implemented |
UD0915 # 10 Y:2014 | 10 | 2014 | ADD AREA LIGHTING SWITCHES | $117 | $0 | Not Implemented |
UD0915 # 01 Y:2014 | 01 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,262 | $0 | Implemented |
UD0915 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,184 | $1,200 | Implemented |
UD0915 # 03 Y:2014 | 03 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,714 | $1,800 | Implemented |
UD0915 # 06 Y:2014 | 06 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $17,210 | $23,600 | Not Implemented |
UD0915 # 05 Y:2014 | 05 | 2014 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,180 | $700 | Not Implemented |
UD0915 # 08 Y:2014 | 08 | 2014 | COVER OPEN TANKS | $14,519 | $39,186 | Not Implemented |
WV0466 # 03 Y:2013 | 03 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,380 | $0 | Not Implemented |
WV0466 # 07 Y:2013 | 07 | 2013 | BURN WASTE OIL FOR HEAT | $2,530 | $4,000 | Not Implemented |
WV0466 # 13 Y:2013 | 13 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $477 | $470 | Implemented |
WV0466 # 08 Y:2013 | 08 | 2013 | IMPROVE LUBRICATION PRACTICES | $2,167 | $1,000 | Implemented |
WV0466 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,160 | $488 | Implemented |
WV0466 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,752 | $3,840 | Not Implemented |
WV0466 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $73,182 | $32,900 | Not Implemented |
WV0466 # 02 Y:2013 | 02 | 2013 | INSULATE BARE EQUIPMENT | $15,207 | $35,976 | Implemented |
WV0466 # 04 Y:2013 | 04 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $11,321 | $1,000 | Not Implemented |