Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
210
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0665 # 08 Y:2024 | 08 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,306 | $1,070 | n/a |
WV0665 # 04 Y:2024 | 04 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $7,315 | $22,800 | n/a |
WV0665 # 09 Y:2024 | 09 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $2,096 | $1,417 | n/a |
WV0665 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $3,763 | $2,971 | n/a |
WV0665 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $61,926 | $238,677 | n/a |
WV0665 # 12 Y:2024 | 12 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,582 | $375 | n/a |
WV0665 # 10 Y:2024 | 10 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,835 | $150 | n/a |
WV0665 # 11 Y:2024 | 11 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,829 | $9,140 | n/a |
WV0665 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $100,715 | $390,000 | n/a |
WV0665 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,064 | $3,296 | n/a |
WV0665 # 03 Y:2024 | 03 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $7,375 | $13,475 | n/a |
WV0665 # 05 Y:2024 | 05 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $6,272 | $1,500 | n/a |
NC0646 # 03 Y:2020 | 03 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $188 | $83 | Not Implemented |
NC0646 # 05 Y:2020 | 05 | 2020 | OPTIMIZE PLANT POWER FACTOR | $2,484 | $7,500 | Not Implemented |
NC0646 # 04 Y:2020 | 04 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $694 | $362 | Implemented |
NC0646 # 01 Y:2020 | 01 | 2020 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $377,240 | $300,000 | Implemented |
NC0646 # 06 Y:2020 | 06 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,817 | $6,709 | Not Implemented |
NC0646 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $225 | $778 | Not Implemented |
NC0545 # 14 Y:2015 | 14 | 2015 | REDUCE FLUID FLOW RATES | $8,008 | $11,000 | Not Implemented |
NC0545 # 11 Y:2015 | 11 | 2015 | INSTALL OCCUPANCY SENSORS | $261 | $497 | Not Implemented |
NC0545 # 16 Y:2015 | 16 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $192 | $221 | Not Implemented |
NC0545 # 15 Y:2015 | 15 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,331 | $14,100 | Not Implemented |
NC0545 # 08 Y:2015 | 08 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,072 | $3,600 | Not Implemented |
NC0545 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,889 | $30,733 | Implemented |
NC0545 # 07 Y:2015 | 07 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,690 | $100 | Not Implemented |