IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0648 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,045 $75,000 Not Implemented
WV0648 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $5,278 $7,699 Not Implemented
WV0648 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $2,796 $1,931 Not Implemented
WV0648 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,218 $3,090 Implemented
WV0648 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,542 $7,652 Implemented
WV0648 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,494 $566 Implemented
WV0648 # 07 Y:2023 07 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,285 $1,500 Implemented
WV0648 # 08 Y:2023 08 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,085 $1,500 Implemented
WV0648 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $997 $3,526 Implemented
WV0648 # 10 Y:2023 10 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $798 $127 Not Implemented
WV0648 # 11 Y:2023 11 2023 DEVELOP A REPAIR/REPLACE POLICY $611 $1,094 Not Implemented
WV0648 # 12 Y:2023 12 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $123 $219 Implemented
WV0644 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $23,558 $12,360 Not Implemented
WV0644 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,092 $29,560 Not Implemented
WV0644 # 03 Y:2023 03 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,500 $1,023 Implemented
WV0644 # 04 Y:2023 04 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $4,007 $10,420 Not Implemented
WV0644 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $954 $1,965 Implemented
WV0644 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $530 $100 Implemented
WV0644 # 07 Y:2023 07 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $523 $1,573 Implemented
WV0644 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $459 $1,293 Implemented
WV0644 # 09 Y:2023 09 2023 DEVELOP A REPAIR/REPLACE POLICY $310 $592 Implemented
WV0644 # 10 Y:2023 10 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $76 $368 Implemented
WV0644 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $21 $31 Implemented
OR0767 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,793 $0 Not Implemented
OR0767 # 02 Y:2023 02 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $172,773 $37,200 Implemented