IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0303 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,403 $400 Implemented
BD0303 # 05 Y:2006 05 2006 USE SYNTHETIC LUBRICANT $1,275 $1,500 Implemented
BD0303 # 06 Y:2006 06 2006 USE PHOTOCELL CONTROLS $903 $2,000 Not Implemented
BD0303 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $168 $225 Not Implemented
WV0333 # 01 Y:2006 01 2006 BURN WASTE OIL FOR HEAT $23,934 $19,500 Not Implemented
WV0333 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,663 $195 Implemented
WV0333 # 03 Y:2006 03 2006 DEVELOP A REPAIR/REPLACE POLICY $2,692 $544 Implemented
WV0333 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,819 $800 Implemented
WV0333 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $397 $210 Not Implemented
WV0333 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $0 Not Implemented
AS0413 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,882 $1,000 Implemented
AS0413 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,423 $15,000 Implemented
AS0413 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,455 $15,000 Implemented
MA0595 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,853 $158,280 Not Implemented
MA0595 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,311 $27,000 Implemented
MA0595 # 03 Y:2006 03 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,019 $8,507 Not Implemented
MA0595 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $935 $0 Implemented
MA0595 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $62 $150 Implemented
MI0122 # 01 Y:2006 01 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $18,965 $5,163 Not Implemented
MI0122 # 02 Y:2006 02 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $15,874 $3,709 Not Implemented
MI0122 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,318 $1,074 Not Implemented
MI0122 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,569 $1,074 Not Implemented
MI0122 # 05 Y:2006 05 2006 UPGRADE OBSOLETE EQUIPMENT $1,134 $28 Not Implemented
MI0122 # 06 Y:2006 06 2006 UPGRADE OBSOLETE EQUIPMENT $1,085 $28 Not Implemented
MI0122 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $260 Not Implemented