IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0262 # 09 Y:2004 09 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $815 $444 Implemented
MI0070 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $21,868 $2,300 Implemented
MI0070 # 02 Y:2004 02 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $197,433 $74,805 Implemented
MI0070 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $175 $0 Not Implemented
MI0070 # 04 Y:2004 04 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,397 $5,248 Implemented
MI0070 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,027 $0 Not Implemented
MA0565 # 01 Y:2004 01 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $216,000 $125,000 Implemented
MA0565 # 02 Y:2004 02 2004 $57,540 $40,000 Implemented
MA0565 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,088 $8,000 Not Implemented
MA0565 # 04 Y:2004 04 2004 REPLACE BOILER $2,760 $750 Implemented
MA0565 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $2,705 $754 Implemented
MA0565 # 06 Y:2004 06 2004 INSULATE FEEDWATER TANK $873 $300 Implemented
MA0565 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $656 $548 Not Implemented
OR0468 # 01 Y:2004 01 2004 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $19,500 $235 Not Implemented
OR0468 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,200 $9,200 Implemented
OR0468 # 03 Y:2004 03 2004 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $3,000 $0 Implemented
OR0468 # 04 Y:2004 04 2004 UPGRADE CONTROLS ON COMPRESSORS $22,000 $1,200 Implemented
OR0468 # 05 Y:2004 05 2004 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $72,800 $13,600 Not Implemented
OR0468 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $3,200 $3,100 Not Implemented
OR0468 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,200 $27,800 Implemented
OR0468 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,700 $13,800 Implemented
OR0468 # 09 Y:2004 09 2004 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $14,800 $15,700 Implemented
OR0468 # 10 Y:2004 10 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $15,800 $26,600 Implemented
OR0468 # 11 Y:2004 11 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,650 $24,900 Not Implemented
OR0468 # 12 Y:2004 12 2004 INSTALL EQUIPMENT TO MOVE PRODUCT $102,400 $242,000 Not Implemented