Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,223
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0262 # 09 Y:2004 | 09 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $815 | $444 | Implemented |
MI0070 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $21,868 | $2,300 | Implemented |
MI0070 # 02 Y:2004 | 02 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $197,433 | $74,805 | Implemented |
MI0070 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $175 | $0 | Not Implemented |
MI0070 # 04 Y:2004 | 04 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $11,397 | $5,248 | Implemented |
MI0070 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,027 | $0 | Not Implemented |
MA0565 # 01 Y:2004 | 01 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $216,000 | $125,000 | Implemented |
MA0565 # 02 Y:2004 | 02 | 2004 | $57,540 | $40,000 | Implemented | |
MA0565 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,088 | $8,000 | Not Implemented |
MA0565 # 04 Y:2004 | 04 | 2004 | REPLACE BOILER | $2,760 | $750 | Implemented |
MA0565 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $2,705 | $754 | Implemented |
MA0565 # 06 Y:2004 | 06 | 2004 | INSULATE FEEDWATER TANK | $873 | $300 | Implemented |
MA0565 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $656 | $548 | Not Implemented |
OR0468 # 01 Y:2004 | 01 | 2004 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $19,500 | $235 | Not Implemented |
OR0468 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,200 | $9,200 | Implemented |
OR0468 # 03 Y:2004 | 03 | 2004 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $3,000 | $0 | Implemented |
OR0468 # 04 Y:2004 | 04 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $22,000 | $1,200 | Implemented |
OR0468 # 05 Y:2004 | 05 | 2004 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $72,800 | $13,600 | Not Implemented |
OR0468 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $3,200 | $3,100 | Not Implemented |
OR0468 # 07 Y:2004 | 07 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,200 | $27,800 | Implemented |
OR0468 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,700 | $13,800 | Implemented |
OR0468 # 09 Y:2004 | 09 | 2004 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $14,800 | $15,700 | Implemented |
OR0468 # 10 Y:2004 | 10 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,800 | $26,600 | Implemented |
OR0468 # 11 Y:2004 | 11 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,650 | $24,900 | Not Implemented |
OR0468 # 12 Y:2004 | 12 | 2004 | INSTALL EQUIPMENT TO MOVE PRODUCT | $102,400 | $242,000 | Not Implemented |