IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0755 # 04 Y:2022 04 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,507,357 $45,058 Not Implemented
OR0755 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,503 $23,536 Not Implemented
OR0755 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $13,297 $55,141 Not Implemented
OR0755 # 07 Y:2022 07 2022 REPLACE BOILER $3,641,663 $6,124,080 Not Implemented
AS0525 # 01 Y:2022 01 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $66,619 $458,235 Not Implemented
AS0525 # 02 Y:2022 02 2022 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $32,935 $15,560 Implemented
AS0525 # 03 Y:2022 03 2022 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $22,011 $1,900 Implemented
AS0525 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,910 $12,950 Implemented
AS0525 # 05 Y:2022 05 2022 APPLY FOR INVESTMENT INCENTIVES $17,475 $500 Implemented
AS0525 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,862 $6,763 Implemented
AS0525 # 07 Y:2022 07 2022 USE PHOTOCELL CONTROLS $894 $144 Not Implemented
AS0525 # 08 Y:2022 08 2022 MAINTAIN MACHINES TO REDUCE LEAKS $705 $1,992 Implemented
UA0259 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,827 $1,000 Implemented
UA0259 # 02 Y:2022 02 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,057 $2,063 Not Implemented
UA0259 # 03 Y:2022 03 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $100,047 $47,295 Not Implemented
UA0259 # 04 Y:2022 04 2022 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $225,594 $969,631 Not Implemented
UA0259 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $50,082 $26,090 Implemented
MS0397 # 01 Y:2022 01 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $851 $7,078 Not Implemented
MS0397 # 02 Y:2022 02 2022 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,868 $2,607 Not Implemented
MS0397 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,556 $1,796 Not Implemented
LE0525 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $993 $150 Implemented
LE0525 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,698 $5,000 Not Implemented
LE0525 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $108,808 $250,000 Not Implemented
LE0525 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $763 $2,001 Implemented
LE0525 # 05 Y:2022 05 2022 BURN WOOD BY-PRODUCTS FOR HEAT $41,476 $130,000 Not Implemented