Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,223
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0750 # 03 Y:2022 | 03 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $32,591 | $4,338 | Not Implemented |
OR0750 # 04 Y:2022 | 04 | 2022 | INCREASE USE OF AUTOMATION | $149,543 | $65,909 | Not Implemented |
OR0750 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $87,087 | $87,086 | Not Implemented |
OR0750 # 06 Y:2022 | 06 | 2022 | OPTIMIZE PLANT POWER FACTOR | $49,792 | $155,954 | Not Implemented |
AS0515 # 01 Y:2022 | 01 | 2022 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $125,792 | $20,098 | Implemented |
AS0515 # 02 Y:2022 | 02 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $30,224 | $146,764 | Not Implemented |
AS0515 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,340 | $9,935 | Not Implemented |
AS0515 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,528 | $28,033 | Implemented |
AS0515 # 05 Y:2022 | 05 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,571 | $72,520 | Implemented |
AS0515 # 06 Y:2022 | 06 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $27,420 | $500 | Implemented |
AS0515 # 07 Y:2022 | 07 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,242 | $7,928 | Implemented |
AS0515 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $1,832 | $3,388 | Implemented |
OR0739 # 01 Y:2021 | 01 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,888 | $0 | Implemented |
OR0739 # 02 Y:2021 | 02 | 2021 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $12,852 | $1,794 | Not Implemented |
OR0739 # 03 Y:2021 | 03 | 2021 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $11,419 | $32,321 | Not Implemented |
LS2113 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,608 | $50 | Not Implemented |
LS2113 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,312 | $318 | Not Implemented |
LS2113 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,491 | $585 | Implemented |
LS2113 # 04 Y:2021 | 04 | 2021 | INSTALL OCCUPANCY SENSORS | $2,236 | $646 | Not Implemented |
LS2113 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,876 | $16,200 | Not Implemented |
LS2113 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,512 | $6,847 | Implemented |
LE0511 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $824 | $35 | Not Implemented |
LE0511 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,197 | $14,875 | Implemented |
LE0511 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,917 | $8,000 | Not Implemented |
LE0511 # 04 Y:2021 | 04 | 2021 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,375 | $7,600 | Not Implemented |