IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0750 # 03 Y:2022 03 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $32,591 $4,338 Not Implemented
OR0750 # 04 Y:2022 04 2022 INCREASE USE OF AUTOMATION $149,543 $65,909 Not Implemented
OR0750 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $87,087 $87,086 Not Implemented
OR0750 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $49,792 $155,954 Not Implemented
AS0515 # 01 Y:2022 01 2022 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $125,792 $20,098 Implemented
AS0515 # 02 Y:2022 02 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $30,224 $146,764 Not Implemented
AS0515 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,340 $9,935 Not Implemented
AS0515 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,528 $28,033 Implemented
AS0515 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $6,571 $72,520 Implemented
AS0515 # 06 Y:2022 06 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $27,420 $500 Implemented
AS0515 # 07 Y:2022 07 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,242 $7,928 Implemented
AS0515 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,832 $3,388 Implemented
OR0739 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,888 $0 Implemented
OR0739 # 02 Y:2021 02 2021 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $12,852 $1,794 Not Implemented
OR0739 # 03 Y:2021 03 2021 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $11,419 $32,321 Not Implemented
LS2113 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,608 $50 Not Implemented
LS2113 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,312 $318 Not Implemented
LS2113 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,491 $585 Implemented
LS2113 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $2,236 $646 Not Implemented
LS2113 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,876 $16,200 Not Implemented
LS2113 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,512 $6,847 Implemented
LE0511 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $824 $35 Not Implemented
LE0511 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,197 $14,875 Implemented
LE0511 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $2,917 $8,000 Not Implemented
LE0511 # 04 Y:2021 04 2021 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,375 $7,600 Not Implemented