IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0369 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $200 $850 Not Implemented
OR0369 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $610 $4,000 Implemented
OR0369 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $732 $5,000 Not Implemented
ME0295 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,961 $72,500 Not Implemented
ME0295 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,533 $20,900 Not Implemented
ME0295 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,918 $11,100 Not Implemented
ME0295 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,043 $860 Not Implemented
ME0295 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,424 $210 Not Implemented
ME0295 # 06 Y:2000 06 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,656 $1,330 Not Implemented
ME0295 # 07 Y:2000 07 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $815 $1,600 Not Implemented
ME0295 # 08 Y:2000 08 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $112 $130 Not Implemented
ME0295 # 09 Y:2000 09 2000 MAKE A NEW BY-PRODUCT $15,041 $21,330 Not Implemented
ME0295 # 10 Y:2000 10 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $27,000 $1,512 Not Implemented
OR0368 # 01 Y:2000 01 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,890 $30,000 Not Implemented
OR0368 # 02 Y:2000 02 2000 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $43,540 $401,460 Not Implemented
OR0368 # 03 Y:2000 03 2000 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,000 $4,040 Implemented
OR0368 # 04 Y:2000 04 2000 ADD ADDITIONAL PRODUCTION SHIFT $5,000 $0 Implemented
OR0368 # 05 Y:2000 05 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,515 $1,500 Not Implemented
ME0292 # 01 Y:2000 01 2000 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $13,365 $13,000 Not Implemented
ME0292 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,056 $26,450 Not Implemented
ME0292 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,527 $9,000 Not Implemented
ME0292 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,822 $340 Implemented
ME0292 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,944 $5,571 Not Implemented
ME0292 # 06 Y:2000 06 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,025 $1,373 Not Implemented
ME0292 # 07 Y:2000 07 2000 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $827 $250 Not Implemented