Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,289
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0700 # 08 Y:2000 | 08 | 2000 | METER WASTE WATER | $2,620 | $500 | Implemented |
GT0700 # 09 Y:2000 | 09 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $620 | $2,490 | Implemented |
GT0700 # 10 Y:2000 | 10 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $250,000 | $180,000 | Not Implemented |
AS0285 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,166 | $1,549 | Not Implemented |
AS0285 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,526 | $7,394 | Not Implemented |
AS0285 # 03 Y:2000 | 03 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,513 | $960 | Not Implemented |
AS0285 # 04 Y:2000 | 04 | 2000 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $216,399 | $200,000 | Not Implemented |
AS0285 # 05 Y:2000 | 05 | 2000 | MODIFY STARTUP/SHUTDOWN TIMES | $3,858 | $120 | Not Implemented |
AS0285 # 06 Y:2000 | 06 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,339 | $2,000 | Not Implemented |
ME0298 # 01 Y:2000 | 01 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,240 | $66,900 | Implemented |
ME0298 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,062 | $5,845 | Not Implemented |
ME0298 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,392 | $340 | Implemented |
ME0298 # 04 Y:2000 | 04 | 2000 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $241 | $450 | Not Implemented |
ME0298 # 05 Y:2000 | 05 | 2000 | INSULATE FEEDWATER TANK | $88 | $250 | Not Implemented |
ME0298 # 06 Y:2000 | 06 | 2000 | REDUCE SCRAP PRODUCTION | $61,470 | $204,600 | Not Implemented |
ME0298 # 07 Y:2000 | 07 | 2000 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $20,769 | $0 | Not Implemented |
ND0344 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,011 | $600 | Implemented |
ND0344 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $333 | $340 | Implemented |
ND0344 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $916 | $720 | Implemented |
ND0344 # 04 Y:2000 | 04 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $2,703 | $10,006 | Implemented |
ND0344 # 05 Y:2000 | 05 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,992 | $900 | Implemented |
ND0344 # 06 Y:2000 | 06 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,935 | $250 | Implemented |
AS0284 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,064 | $2,486 | Implemented |
AS0284 # 02 Y:2000 | 02 | 2000 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,003 | $800 | Not Implemented |
AS0284 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,564 | $3,800 | Not Implemented |