IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,289

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0700 # 08 Y:2000 08 2000 METER WASTE WATER $2,620 $500 Implemented
GT0700 # 09 Y:2000 09 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $620 $2,490 Implemented
GT0700 # 10 Y:2000 10 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $250,000 $180,000 Not Implemented
AS0285 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,166 $1,549 Not Implemented
AS0285 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,526 $7,394 Not Implemented
AS0285 # 03 Y:2000 03 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,513 $960 Not Implemented
AS0285 # 04 Y:2000 04 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $216,399 $200,000 Not Implemented
AS0285 # 05 Y:2000 05 2000 MODIFY STARTUP/SHUTDOWN TIMES $3,858 $120 Not Implemented
AS0285 # 06 Y:2000 06 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,339 $2,000 Not Implemented
ME0298 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,240 $66,900 Implemented
ME0298 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,062 $5,845 Not Implemented
ME0298 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,392 $340 Implemented
ME0298 # 04 Y:2000 04 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $241 $450 Not Implemented
ME0298 # 05 Y:2000 05 2000 INSULATE FEEDWATER TANK $88 $250 Not Implemented
ME0298 # 06 Y:2000 06 2000 REDUCE SCRAP PRODUCTION $61,470 $204,600 Not Implemented
ME0298 # 07 Y:2000 07 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $20,769 $0 Not Implemented
ND0344 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,011 $600 Implemented
ND0344 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $333 $340 Implemented
ND0344 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $916 $720 Implemented
ND0344 # 04 Y:2000 04 2000 DEVELOP A REPAIR/REPLACE POLICY $2,703 $10,006 Implemented
ND0344 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,992 $900 Implemented
ND0344 # 06 Y:2000 06 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,935 $250 Implemented
AS0284 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,064 $2,486 Implemented
AS0284 # 02 Y:2000 02 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,003 $800 Not Implemented
AS0284 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,564 $3,800 Not Implemented