IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0285 # 02 Y:2000 02 2000 USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY $3,500 $0 Implemented
ME0285 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,844 $300 Not Implemented
ME0285 # 04 Y:2000 04 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $706 $1,772 Implemented
ME0285 # 05 Y:2000 05 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $339 $600 Implemented
ME0285 # 06 Y:2000 06 2000 MINIMIZE WATER USAGE $160 $0 Not Implemented
WV0184 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $6,707 $280 Implemented
WV0184 # 02 Y:2000 02 2000 REDUCE VENTILATION AIR $694 $1,170 Not Implemented
WV0184 # 03 Y:2000 03 2000 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $33,886 $10,000 Implemented
WV0184 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,156 $220 Implemented
WV0184 # 05 Y:2000 05 2000 PAY BILLS ON TIME TO AVOID LATE FEES $40,958 $200 Implemented
WV0184 # 06 Y:2000 06 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $4,706 $870 Not Implemented
WV0184 # 07 Y:2000 07 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,710 $11,000 Implemented
WV0184 # 08 Y:2000 08 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $257,040 $105,000 Not Implemented
TN0680 # 01 Y:2000 01 2000 BURN A LESS EXPENSIVE GRADE OF FUEL $75,400 $400,000 Not Implemented
TN0680 # 02 Y:2000 02 2000 MODIFY CURRENT INCENTIVE PROGRAM $37,500 $16,430 Implemented
TN0680 # 03 Y:2000 03 2000 DEVELOP A REPAIR/REPLACE POLICY $30,832 $1,075 Not Implemented
TN0680 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,356 $18,370 Not Implemented
TN0680 # 05 Y:2000 05 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,810 $500 Implemented
TN0680 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $960 $0 Not Implemented
AM0367 # 01 Y:2000 01 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,240 $565 Implemented
AM0367 # 02 Y:2000 02 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,560 $0 Implemented
AM0367 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,090 $500 Implemented
AM0367 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $560 $0 Implemented
AM0367 # 05 Y:2000 05 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $505 $290 Implemented
AM0367 # 06 Y:2000 06 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $355 $0 Implemented