Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
289
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0623 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,460 | $11,957 | Not Implemented |
OR0623 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,693 | $1,500 | Implemented |
OR0623 # 05 Y:2013 | 05 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,023 | $9,452 | Not Implemented |
OR0623 # 02 Y:2013 | 02 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,199 | $1,260 | Not Implemented |
OR0623 # 04 Y:2013 | 04 | 2013 | MODIFY STARTUP/SHUTDOWN TIMES | $2,617 | $2,500 | Not Implemented |
OR0623 # 01 Y:2013 | 01 | 2013 | MODIFY STARTUP/SHUTDOWN TIMES | $7,500 | $700 | Not Implemented |
SF0421 # 04 Y:2012 | 04 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $24,965 | $104,550 | Not Implemented |
SF0421 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,282 | $29,386 | Implemented |
SF0421 # 05 Y:2012 | 05 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,801 | $22,991 | Implemented |
SF0421 # 03 Y:2012 | 03 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,494 | $10,564 | Not Implemented |
SF0421 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $144 | $70 | Not Implemented |
SF0421 # 01 Y:2012 | 01 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,912 | $0 | Not Implemented |
SF0421 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,017 | $0 | Implemented |
SF0417 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $37,829 | $21,581 | Not Implemented |
SF0417 # 06 Y:2012 | 06 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,063 | $2,490 | Not Implemented |
SF0417 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,459 | $0 | Implemented |
SF0417 # 04 Y:2012 | 04 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,237 | $239 | Implemented |
SF0417 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $6,916 | $31,417 | Implemented |
SF0417 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $915 | $58 | Not Implemented |
SF0417 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,407 | $16,180 | Implemented |
SF0417 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,561 | $0 | Not Implemented |
SD0433 # 03 Y:2011 | 03 | 2011 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,821 | $5,000 | Not Implemented |
SD0433 # 02 Y:2011 | 02 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $881 | $300 | Implemented |
SD0433 # 01 Y:2011 | 01 | 2011 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $119 | $10 | Not Implemented |
SD0433 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $3,508 | $1,805 | Implemented |