IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0129 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,102 $0 Implemented
OR0129 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,277 $0 Implemented
OR0129 # 03 Y:1991 03 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,236 $30,000 Implemented
OR0129 # 04 Y:1991 04 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,626 $0 Implemented
OR0129 # 05 Y:1991 05 1991 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,068 $3,066 Implemented
OR0129 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,072 $0 Implemented
OR0129 # 07 Y:1991 07 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,573 $40,000 Implemented
OR0129 # 08 Y:1991 08 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $522 $864 Implemented
OR0129 # 09 Y:1991 09 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $790 $1,430 Implemented
OR0129 # 10 Y:1991 10 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,172 $0 Implemented
OR0129 # 11 Y:1991 11 1991 OPTIMIZE PLANT POWER FACTOR $12,146 $26,250 Implemented
OR0129 # 12 Y:1991 12 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $952 $2,150 Implemented
OR0129 # 13 Y:1991 13 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,521 $15,000 Implemented
OR0129 # 14 Y:1991 14 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,227 $64,975 Implemented
AM0130 # 01 Y:1991 01 1991 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,280 $19,700 Not Implemented
AM0130 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,148 $653 Not Implemented
AM0130 # 03 Y:1991 03 1991 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $4,979 $16,000 Not Implemented
AM0130 # 04 Y:1991 04 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,370 $0 Not Implemented
AM0130 # 05 Y:1991 05 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $500 Not Implemented
AM0130 # 06 Y:1991 06 1991 IMPROVE LUBRICATION PRACTICES $1,109 $0 Not Implemented
AM0130 # 07 Y:1991 07 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $240 $0 Not Implemented
AM0130 # 08 Y:1991 08 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $140 $55 Not Implemented
AM0131 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,223 $1,427 Implemented
AM0131 # 02 Y:1991 02 1991 IMPROVE LUBRICATION PRACTICES $1,620 $0 Implemented
AM0131 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,420 $0 Implemented