IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

139

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0381 # 01 Y:2008 01 2008 INSTALL TIMERS AND/OR THERMOSTATS $70,581 $24,000 Not Implemented
WV0381 # 02 Y:2008 02 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $43,659 $3,500 Not Implemented
WV0381 # 03 Y:2008 03 2008 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $53,901 $12,000 Not Implemented
WV0381 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,296 $19,992 Implemented
WV0381 # 05 Y:2008 05 2008 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $28,475 $76,200 Implemented
WV0381 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $25,696 $34,550 Implemented
WV0381 # 07 Y:2008 07 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,395 $2,100 Implemented
WV0381 # 08 Y:2008 08 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,259 $25,425 Implemented
WV0381 # 09 Y:2008 09 2008 COMBINE UTILITY METERS $10,426 $20,000 Not Implemented
WV0381 # 10 Y:2008 10 2008 DEVELOP A REPAIR/REPLACE POLICY $8,516 $1,250 Not Implemented
WV0381 # 11 Y:2008 11 2008 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $7,681 $10,660 Implemented
WV0381 # 12 Y:2008 12 2008 INSTALL SET-BACK TIMERS $6,981 $1,150 Implemented
WV0381 # 13 Y:2008 13 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,036 $38,700 Not Implemented
WV0381 # 14 Y:2008 14 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,586 $0 Not Implemented
WV0381 # 15 Y:2008 15 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,545 $2,940 Not Implemented
WV0381 # 16 Y:2008 16 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,867 $1,300 Not Implemented
WV0324 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $11,798 $10,700 Not Implemented
WV0324 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $7,542 $6,594 Implemented
WV0324 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,407 $900 Implemented
WV0324 # 04 Y:2005 04 2005 DEVELOP A REPAIR/REPLACE POLICY $2,674 $135 Implemented
WV0324 # 05 Y:2005 05 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,788 $0 Not Implemented
WV0324 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,567 $0 Implemented
WV0324 # 07 Y:2005 07 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,475 $1,005 Not Implemented
WV0324 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,399 $60 Not Implemented
WV0324 # 09 Y:2005 09 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,312 $165 Implemented