Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
222
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0284 # 08 Y:2000 | 08 | 2000 | PAY BILLS ON TIME TO AVOID LATE FEES | $771 | $60 | Not Implemented |
AS0284 # 09 Y:2000 | 09 | 2000 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $14,280 | $2,240 | Implemented |
AS0266 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,785 | $7,353 | n/a |
AS0266 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $574 | $1,050 | n/a |
AS0266 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $304 | $377 | n/a |
AS0266 # 04 Y:2000 | 04 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $122 | $100 | n/a |
AS0266 # 05 Y:2000 | 05 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,039 | $60 | n/a |
AS0266 # 06 Y:2000 | 06 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,615 | $7,674 | n/a |
AS0266 # 07 Y:2000 | 07 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $472 | $120 | n/a |
AS0266 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $172,500 | $26,000 | n/a |
AS0266 # 09 Y:2000 | 09 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,626 | $240 | n/a |
AS0260 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,960 | $8,259 | n/a |
AS0260 # 02 Y:1999 | 02 | 1999 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,591 | $1,300 | n/a |
AS0260 # 03 Y:1999 | 03 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,200 | $7,600 | n/a |
AS0260 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $423 | $60 | n/a |
AS0260 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,157 | $240 | n/a |
AS0260 # 06 Y:1999 | 06 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $4,639 | $1,060 | n/a |
AS0260 # 07 Y:1999 | 07 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,300 | $30 | n/a |
AS0260 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $970 | $0 | n/a |
AS0254 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,761 | $10,671 | Not Implemented |
AS0254 # 02 Y:1999 | 02 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,410 | $3,840 | Not Implemented |
AS0254 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,133 | $2,400 | Implemented |
AS0254 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,330 | $840 | Implemented |
AS0254 # 05 Y:1999 | 05 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,213 | $3,800 | Not Implemented |
AS0254 # 06 Y:1999 | 06 | 1999 | RECYCLE WHITE WATER | $14,029 | $500 | Implemented |