IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0005 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,970 $609 Implemented
BS0005 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,733 $178 Implemented
BS0005 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,615 $10,000 Implemented
BS0005 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,653 $7,846 Not Implemented
BS0005 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $11,990 $17,000 Not Implemented
SF0421 # 01 Y:2012 01 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,912 $0 Not Implemented
SF0421 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,017 $0 Implemented
SF0421 # 03 Y:2012 03 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,494 $10,564 Not Implemented
SF0421 # 04 Y:2012 04 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,965 $104,550 Not Implemented
SF0421 # 05 Y:2012 05 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,801 $22,991 Implemented
SF0421 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,282 $29,386 Implemented
SF0421 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $70 Not Implemented
NC0463 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $15,737 $15,000 Not Implemented
NC0463 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,159 $1,400 Implemented
NC0463 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,208 $200 Implemented
NC0463 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,015 $1,124 Implemented
NC0463 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24 $135 Not Implemented
NC0463 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $4,367 $5,000 Implemented
TT0096 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $463 $0 Implemented
TT0096 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,193 $1,753 Not Implemented
TT0096 # 03 Y:2012 03 2012 REPAIR AND ELIMINATE STEAM LEAKS $26,105 $10,000 Implemented
TT0096 # 04 Y:2012 04 2012 UPGRADE CONTROLS ON COMPRESSORS $1,892 $1,000 Implemented
TT0096 # 05 Y:2012 05 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,900 $2,000 Not Implemented
TT0096 # 06 Y:2012 06 2012 RECOVER AND REUSE WASTE MATERIAL $330,000 $630,000 Not Implemented
OR0590 # 01 Y:2012 01 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,954 $5,038 Not Implemented