IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0538 # 05 Y:2008 05 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $9,200 $0 Not Implemented
AM0538 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,770 $1,120 Implemented
AM0538 # 07 Y:2008 07 2008 USE SYNTHETIC LUBRICANT $1,045 $0 Not Implemented
WV0367 # 01 Y:2008 01 2008 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $870,056 $3,850,000 Not Implemented
WV0367 # 02 Y:2008 02 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $16,386 $3,500 Implemented
WV0367 # 03 Y:2008 03 2008 DEVELOP A REPAIR/REPLACE POLICY $11,577 $1,336 Implemented
WV0367 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,511 $0 Implemented
WV0367 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $2,892 $485 Not Implemented
WV0367 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,538 $0 Implemented
WV0367 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,042 $185 Not Implemented
WV0367 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $780 $2,158 Implemented
UA0012 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,155 $700 Implemented
UA0012 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,165 $0 Implemented
UA0012 # 03 Y:2007 03 2007 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $1,063,171 $5,532,000 Not Implemented
UA0012 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,620 $9,817 Not Implemented
UA0012 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $737 $7,504 Not Implemented
UA0012 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,429 $1,230 Not Implemented
BD0337 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $927 $1,115 Not Implemented
BD0337 # 02 Y:2007 02 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,425 $480 Implemented
BD0337 # 03 Y:2007 03 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,084 $2,150 Not Implemented
BD0337 # 04 Y:2007 04 2007 USE SYNTHETIC LUBRICANT $228 $601 Not Implemented
BD0337 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $926 $2 Not Implemented
OR0525 # 01 Y:2007 01 2007 $246,000 $900,000 Not Implemented
OR0525 # 02 Y:2007 02 2007 $19,700 $0 Implemented
OR0525 # 03 Y:2007 03 2007 $5,000 $25,000 Not Implemented