Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
132
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0042 # 04 Y:1988 | 04 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,087 | $623 | Implemented |
OR0042 # 02 Y:1988 | 02 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,164 | $5,000 | Implemented |
LT0136 # 05 Y:1988 | 05 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $160 | $0 | Implemented |
GT0364 # 03 Y:1988 | 03 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,433 | $0 | Implemented |
LT0136 # 01 Y:1988 | 01 | 1988 | REDESIGN PROCESS | $5,130 | $720 | Not Implemented |
LT0136 # 03 Y:1988 | 03 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $689 | $1,755 | Implemented |
LT0136 # 04 Y:1988 | 04 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,235 | $246 | Implemented |
LT0136 # 02 Y:1988 | 02 | 1988 | USE RADIANT HEATER FOR SPOT HEATING | $950 | $1,200 | Not Implemented |
GT0364 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $74 | $150 | Implemented |
GT0364 # 02 Y:1988 | 02 | 1988 | IMPROVE LUBRICATION PRACTICES | $2,630 | $0 | Implemented |
OR0042 # 03 Y:1988 | 03 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,349 | $500 | Not Implemented |
GT0364 # 04 Y:1988 | 04 | 1988 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $19,102 | $28,000 | Not Implemented |
OR0042 # 06 Y:1988 | 06 | 1988 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $36,759 | $0 | Not Implemented |
OR0042 # 01 Y:1988 | 01 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,776 | $0 | Implemented |
OR0042 # 05 Y:1988 | 05 | 1988 | OPTIMIZE PLANT POWER FACTOR | $2,293 | $4,800 | Implemented |
OR0039 # 03 Y:1988 | 03 | 1988 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $73,000 | $100,000 | Not Implemented |
OR0039 # 04 Y:1988 | 04 | 1988 | OPTIMIZE PLANT POWER FACTOR | $6,379 | $13,650 | Implemented |
OR0039 # 02 Y:1988 | 02 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $498 | $630 | Implemented |
OR0039 # 01 Y:1988 | 01 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,384 | $5,000 | Implemented |
OR0038 # 04 Y:1988 | 04 | 1988 | OPTIMIZE PLANT POWER FACTOR | $3,067 | $7,800 | Implemented |
OR0038 # 03 Y:1988 | 03 | 1988 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,799 | $3,021 | Not Implemented |
OR0038 # 02 Y:1988 | 02 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $373 | $350 | Implemented |
OR0038 # 01 Y:1988 | 01 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,528 | $3,000 | Implemented |
OR0039 # 05 Y:1988 | 05 | 1988 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $15,101 | $32,576 | Implemented |
LT0131 # 08 Y:1988 | 08 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $85 | $0 | Implemented |