Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
270
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0447 # 03 Y:2003 | 03 | 2003 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $28,720 | $150 | Implemented |
OR0447 # 02 Y:2003 | 02 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $43,500 | $4,910 | Not Implemented |
OR0447 # 01 Y:2003 | 01 | 2003 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $105,200 | $7,000 | Implemented |
OR0447 # 04 Y:2003 | 04 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,460 | $880 | Implemented |
OR0446 # 06 Y:2003 | 06 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $6,780 | $26,000 | Implemented |
OR0446 # 05 Y:2003 | 05 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $27,050 | $98,000 | Not Implemented |
OR0446 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $21,800 | $21,600 | Implemented |
OR0446 # 01 Y:2003 | 01 | 2003 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $508,000 | $28,000 | Not Implemented |
OR0446 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,100 | $13,000 | Implemented |
OR0446 # 02 Y:2003 | 02 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,000 | $8,100 | Implemented |
NC0273 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $705 | $500 | Not Implemented |
OR0444 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,600 | $18,610 | Not Implemented |
OR0444 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,210 | $8,170 | Implemented |
OR0444 # 02 Y:2003 | 02 | 2003 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $30,800 | $2,000 | Not Implemented |
OR0444 # 01 Y:2003 | 01 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $967,810 | $181,200 | Implemented |
NC0273 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $51 | $104 | Not Implemented |
NC0273 # 05 Y:2003 | 05 | 2003 | USE PHOTOCELL CONTROLS | $137 | $200 | Not Implemented |
NC0273 # 02 Y:2003 | 02 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $232 | $83 | Implemented |
NC0273 # 06 Y:2003 | 06 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $879 | $390 | Implemented |
NC0273 # 03 Y:2003 | 03 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $65 | $0 | Implemented |
OR0443 # 07 Y:2003 | 07 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,348 | $0 | Not Implemented |
OR0443 # 05 Y:2003 | 05 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,950 | $16,800 | n/a |
OR0443 # 02 Y:2003 | 02 | 2003 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $46,744 | $15,000 | Not Implemented |
OR0443 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,080 | $10,100 | Implemented |
OR0443 # 06 Y:2003 | 06 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,770 | $665 | Implemented |