matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0225 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,558 | $100 | Implemented |
LE0225 # 04 Y:2005 | 04 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,707 | $200 | Implemented |
LE0225 # 07 Y:2005 | 07 | 2005 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,914 | $2,500 | Implemented |
LE0225 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,090 | $35,595 | Implemented |
LE0225 # 03 Y:2005 | 03 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $11,161 | $2,800 | Not Implemented |
LE0225 # 05 Y:2005 | 05 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,158 | $800 | Not Implemented |
LE0225 # 08 Y:2005 | 08 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,118 | $350 | Not Implemented |
LE0225 # 02 Y:2005 | 02 | 2005 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $17,500 | $50,000 | Implemented |
LE0225 # 01 Y:2005 | 01 | 2005 | INSTALL EQUIPMENT TO MOVE PRODUCT | $28,200 | $2,000 | Not Implemented |
AS0407 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $989 | $2,000 | Not Implemented |
AS0407 # 02 Y:2005 | 02 | 2005 | USE SOLAR HEAT TO HEAT WATER | $1,251 | $3,200 | Not Implemented |
AS0407 # 01 Y:2005 | 01 | 2005 | INSTALL EQUIPMENT TO MOVE PRODUCT | $257,790 | $218,456 | Not Implemented |
AS0407 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $744 | $2,000 | Not Implemented |
CO0576 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $920 | $1,440 | Not Implemented |
CO0576 # 07 Y:2005 | 07 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,740 | $980 | Not Implemented |
CO0576 # 02 Y:2005 | 02 | 2005 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $4,450 | $0 | Not Implemented |
CO0576 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,540 | $190 | Implemented |
CO0576 # 06 Y:2005 | 06 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,670 | $9,240 | Not Implemented |
CO0576 # 05 Y:2005 | 05 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,190 | $17,170 | Not Implemented |
CO0576 # 04 Y:2005 | 04 | 2005 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $200 | $170 | Implemented |
CO0576 # 01 Y:2005 | 01 | 2005 | INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES | $84,000 | $30,670 | Not Implemented |
OR0489 # 02 Y:2005 | 02 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,600 | $340 | Implemented |
OR0489 # 01 Y:2005 | 01 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $19,500 | $5,400 | Not Implemented |
OR0489 # 03 Y:2005 | 03 | 2005 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $80,000 | $58,000 | Not Implemented |
OR0489 # 04 Y:2005 | 04 | 2005 | USE PHOTOCELL CONTROLS | $2,330 | $100 | Implemented |