Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsSIC | 242 | Sawmills And Planing Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0497 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,314 | $28,000 | Not Implemented |
MA0497 # 01 Y:2001 | 01 | 2001 | COMBINE UTILITY METERS | $38,169 | $79,800 | n/a |
MA0497 # 02 Y:2001 | 02 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $22,000 | $50,000 | Implemented |
MA0497 # 03 Y:2001 | 03 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,603 | $62,600 | Not Implemented |
MA0494 # 09 Y:2001 | 09 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $759 | $0 | Implemented |
MA0494 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,014 | $200,000 | n/a |
MA0494 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,732 | $5,000 | Implemented |
MA0494 # 03 Y:2001 | 03 | 2001 | RECOVER MECHANICAL ENERGY | $18,000 | $80,000 | n/a |
MA0494 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,346 | $19,000 | Implemented |
MA0494 # 05 Y:2001 | 05 | 2001 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $6,536 | $24,000 | Not Implemented |
MA0494 # 06 Y:2001 | 06 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,263 | $13,000 | Not Implemented |
MA0494 # 07 Y:2001 | 07 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $610 | $2,700 | Implemented |
MA0494 # 08 Y:2001 | 08 | 2001 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $476 | $500 | Not Implemented |
MA0478 # 02 Y:2000 | 02 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $9,000 | $40,000 | Not Implemented |
MA0478 # 03 Y:2000 | 03 | 2000 | OPTIMIZE PLANT POWER FACTOR | $6,350 | $5,500 | Implemented |
MA0478 # 04 Y:2000 | 04 | 2000 | INSULATE FEEDWATER TANK | $3,300 | $2,500 | Implemented |
MA0478 # 05 Y:2000 | 05 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,960 | $0 | Implemented |
MA0478 # 06 Y:2000 | 06 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,870 | $13,000 | Not Implemented |
MA0478 # 07 Y:2000 | 07 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,000 | $550 | Implemented |
MA0478 # 08 Y:2000 | 08 | 2000 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,244 | $0 | Not Implemented |
MA0478 # 09 Y:2000 | 09 | 2000 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,080 | $2,000 | Not Implemented |
MA0478 # 10 Y:2000 | 10 | 2000 | INSTALL OCCUPANCY SENSORS | $320 | $450 | Implemented |
MA0478 # 01 Y:2000 | 01 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $50,450 | $222,000 | Not Implemented |