IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

128

matching recommendations
Reset
SIC 242 Sawmills And Planing Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0292 # 11 Y:2000 11 2000 USE OPTIMUM THICKNESS INSULATION $34 $72 Not Implemented
ME0292 # 12 Y:2000 12 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $8,700 $9,500 Not Implemented
ME0292 # 13 Y:2000 13 2000 SELL COMBUSTIBLE WASTE $4,000 $12,000 Not Implemented
ME0292 # 14 Y:2000 14 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $40 $0 Implemented
ME0292 # 15 Y:2000 15 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,500 $1,550 Not Implemented
ME0291 # 01 Y:2000 01 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,702 $60 Not Implemented
ME0291 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,538 $3,943 Not Implemented
ME0291 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $3,294 $4,112 Implemented
ME0291 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,828 $160 Implemented
ME0291 # 05 Y:2000 05 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $790 $750 Not Implemented
ME0291 # 06 Y:2000 06 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $694 $160 Implemented
ME0291 # 07 Y:2000 07 2000 INSTALL TIMERS AND/OR THERMOSTATS $67 $100 Not Implemented
ME0291 # 08 Y:2000 08 2000 BURN WOOD BY-PRODUCTS FOR HEAT $28,257 $53,000 Not Implemented
ME0271 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,060 $47,675 Implemented
ME0271 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,694 $11,058 Implemented
ME0271 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,248 $150 Implemented
ME0271 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $731 $1,580 Not Implemented
ME0271 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $366 $407 Implemented
ME0271 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $224 $100 Implemented
ME0271 # 07 Y:1999 07 1999 MINIMIZE WATER USAGE $8,700 $6,800 Not Implemented
ME0271 # 08 Y:1999 08 1999 USE OTHER METHODS FOR NEUTRALIZATION $6,000 $7,800 Not Implemented
ME0271 # 09 Y:1999 09 1999 METER WASTE WATER $1,684 $200 Implemented
ME0244 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,514 $11,502 Implemented
ME0244 # 02 Y:1998 02 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $2,689 $4,900 Not Implemented
ME0244 # 03 Y:1998 03 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,103 $5,295 Not Implemented