Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
69
matching recommendationsSIC | 242 | Sawmills And Planing Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0606 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,868 | $20,154 | Implemented |
NC0606 # 10 Y:2018 | 10 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $27,412 | $65,590 | Implemented |
NC0606 # 09 Y:2018 | 09 | 2018 | REDESIGN PROCESS | $31,091 | $15,000 | Implemented |
NC0606 # 08 Y:2018 | 08 | 2018 | REPAIR OR REPLACE STEAM TRAPS | $11,945 | $10,500 | Implemented |
NC0606 # 07 Y:2018 | 07 | 2018 | INCREASE AMOUNT OF CONDENSATE RETURNED | $205,770 | $100,000 | Not Implemented |
NC0606 # 06 Y:2018 | 06 | 2018 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $21,044 | $500 | Implemented |
NC0606 # 05 Y:2018 | 05 | 2018 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $48,482 | $180,000 | Implemented |
NC0606 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,634 | $200 | Implemented |
NC0606 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $369 | $547 | Implemented |
NC0606 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,456 | $119,341 | Implemented |
NC0445 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,196 | $0 | Implemented |
NC0445 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,698 | $7,891 | Implemented |
NC0445 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $336 | $126 | Implemented |
NC0445 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $17,271 | $73,750 | Not Implemented |
NC0445 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,573 | $7,197 | Not Implemented |
NC0445 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $575 | $100 | Implemented |
NC0247 # 01 Y:2002 | 01 | 2002 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $44,473 | $120,000 | Implemented |
NC0247 # 07 Y:2002 | 07 | 2002 | DEVELOP A REPAIR/REPLACE POLICY | $774 | $863 | Implemented |
NC0247 # 06 Y:2002 | 06 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $427 | $100 | Implemented |
NC0247 # 02 Y:2002 | 02 | 2002 | INSTALL SKYLIGHTS | $1,646 | $540 | Implemented |
NC0247 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,600 | $2,665 | Implemented |
NC0247 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $591 | $1,597 | Not Implemented |
NC0247 # 09 Y:2002 | 09 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $860 | $500 | Implemented |
NC0247 # 05 Y:2002 | 05 | 2002 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $10,011 | $7,795 | Not Implemented |
NC0247 # 08 Y:2002 | 08 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,850 | $1,004 | Implemented |