Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsSIC | 242 | Sawmills And Planing Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0561 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $640 | $960 | Not Implemented |
CO0561 # 04 Y:2004 | 04 | 2004 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $240 | $480 | Not Implemented |
CO0561 # 05 Y:2004 | 05 | 2004 | INSTALL SKYLIGHTS | $10,440 | $90,000 | Not Implemented |
CO0561 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,380 | $270 | Not Implemented |
CO0561 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $700 | $2,760 | Not Implemented |
CO0561 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,460 | $29,920 | Not Implemented |
CO0561 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,890 | $4,100 | Not Implemented |
TA0090 # 05 Y:2004 | 05 | 2004 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,920 | $120 | Not Implemented |
TA0090 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $910 | $8 | Not Implemented |
TA0090 # 04 Y:2004 | 04 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $2,350 | $0 | Not Implemented |
TA0090 # 01 Y:2004 | 01 | 2004 | CONDENSE OPERATION INTO ONE BUILDING | $91,320 | $20,000 | Not Implemented |
TA0090 # 03 Y:2004 | 03 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $23,490 | $45,000 | Not Implemented |
TA0090 # 02 Y:2004 | 02 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $42,810 | $64,000 | Not Implemented |
TA0090 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $280 | $120 | Implemented |
OR0471 # 03 Y:2004 | 03 | 2004 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $4,600 | $7,100 | Implemented |
OR0471 # 04 Y:2004 | 04 | 2004 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $58,650 | $10,000 | Implemented |
OR0471 # 05 Y:2004 | 05 | 2004 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $102,700 | $77,400 | Not Implemented |
OR0471 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,840 | $4,840 | Implemented |
OR0471 # 02 Y:2004 | 02 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $22,560 | $8,500 | Implemented |
OR0471 # 09 Y:2004 | 09 | 2004 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $6,000 | $1,000 | Implemented |
OR0471 # 08 Y:2004 | 08 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,470 | $9,300 | Not Implemented |
OR0471 # 07 Y:2004 | 07 | 2004 | OPTIMIZE PLANT POWER FACTOR | $18,220 | $20,000 | Not Implemented |
OR0471 # 11 Y:2004 | 11 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,291 | $27,750 | Implemented |
OR0471 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $44,000 | $92,000 | Not Implemented |
OR0471 # 10 Y:2004 | 10 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $251,508 | $60,000 | Not Implemented |