IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
SIC 2421 Sawmills And Planing Mills, General
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0337 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,017 $11 Implemented
AS0337 # 10 Y:2002 10 2002 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $5,640 $60 Not Implemented
AS0337 # 09 Y:2002 09 2002 BURN WASTE OIL FOR HEAT $5,757 $9,000 Not Implemented
AS0337 # 08 Y:2002 08 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,034 $5,800 Not Implemented
AS0337 # 07 Y:2002 07 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $3,565 $60 Implemented
AS0337 # 06 Y:2002 06 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $3,736 $4,622 Implemented
AS0337 # 05 Y:2002 05 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,723 $16,500 Implemented
AS0337 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $209 $164 Implemented
AS0337 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $543 $1,875 Not Implemented
AS0337 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,605 $180 Implemented
OR0419 # 01 Y:2002 01 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,879 $0 Implemented
OR0419 # 03 Y:2002 03 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,988 $3,240 Implemented
OR0419 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,392 $5,000 Implemented
OR0419 # 05 Y:2002 05 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,587 $0 Implemented
OR0419 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $1,581 $1,500 Not Implemented
WV0242 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,167 $0 Implemented
WV0242 # 09 Y:2002 09 2002 BURN WASTE OIL FOR HEAT $5,537 $4,000 Not Implemented
WV0242 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $611 $1,695 Not Implemented
WV0242 # 10 Y:2002 10 2002 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $864 $400 Implemented
WV0242 # 03 Y:2002 03 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,620 $4,870 Implemented
WV0242 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $871 $116 Not Implemented
WV0242 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $304 $0 Implemented
WV0242 # 08 Y:2002 08 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,335 $900 Implemented
WV0242 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,564 $128 Implemented
WV0242 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $456 $72 Implemented