Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 2421 | Sawmills And Planing Mills, General |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0005 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,970 | $609 | Implemented |
BS0005 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,733 | $178 | Implemented |
BS0005 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,615 | $10,000 | Implemented |
BS0005 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,653 | $7,846 | Not Implemented |
BS0005 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $11,990 | $17,000 | Not Implemented |
BS0005 # 01 Y:2012 | 01 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $265 | $555 | Not Implemented |
TT0096 # 06 Y:2012 | 06 | 2012 | RECOVER AND REUSE WASTE MATERIAL | $330,000 | $630,000 | Not Implemented |
TT0096 # 05 Y:2012 | 05 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,900 | $2,000 | Not Implemented |
TT0096 # 04 Y:2012 | 04 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $1,892 | $1,000 | Implemented |
TT0096 # 03 Y:2012 | 03 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $26,105 | $10,000 | Implemented |
TT0096 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,193 | $1,753 | Not Implemented |
TT0096 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $463 | $0 | Implemented |
NC0445 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $17,271 | $73,750 | Not Implemented |
NC0445 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $336 | $126 | Implemented |
NC0445 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,698 | $7,891 | Implemented |
NC0445 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,573 | $7,197 | Not Implemented |
NC0445 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $575 | $100 | Implemented |
NC0445 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,196 | $0 | Implemented |
OR0577 # 01 Y:2012 | 01 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $25,558 | $7,571 | Implemented |
OR0577 # 02 Y:2012 | 02 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,191 | $1,404 | Implemented |
OR0577 # 03 Y:2012 | 03 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $7,720 | $8,890 | Not Implemented |
OR0577 # 04 Y:2012 | 04 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,839 | $17,100 | Implemented |
OR0577 # 05 Y:2012 | 05 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,184 | $4,750 | Not Implemented |
OR0577 # 06 Y:2012 | 06 | 2012 | KEEP SOLID FUELS / RAW MATERIALS DRY | $12,037 | $50,000 | Implemented |
MS0387 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,599 | $351 | Not Implemented |