IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 2426 Hardwood Dimension & Flooring Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0301 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,899 $1,500 Implemented
TT0301 # 05 Y:2023 05 2023 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $8,886 $220 Implemented
TT0301 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,607 $0 Implemented
TT0301 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $32,720 $15,200 Implemented
UA0182 # 09 Y:2017 09 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,563 $4,224 Implemented
UA0182 # 06 Y:2017 06 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $8,680 $3,125 Implemented
UA0182 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,749 $2,465 Implemented
UA0182 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,380 $8,066 Implemented
UA0182 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $32,696 $2,784 Implemented
OK0836 # 04 Y:2012 04 2012 UPGRADE CONTROLS ON COMPRESSORS $28,900 $15,100 Implemented
OK0836 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,400 $10,000 Implemented
OK0836 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,000 $500 Implemented
OK0836 # 06 Y:2012 06 2012 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $7,200 $1,000 Implemented
AR0063 # 08 Y:1995 08 1995 MINIMIZE WATER USAGE $876 $300 Implemented
AR0063 # 07 Y:1995 07 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,746 $0 Implemented
AR0063 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,857 $400 Implemented
AR0063 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,343 $400 Implemented
AR0063 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,437 $9,760 Implemented
AR0063 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,879 $643 Implemented
AR0063 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,213 $3,500 Implemented
AR0063 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $929 $160 Implemented
AR0057 # 06 Y:1995 06 1995 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $20,783 $5,600 Implemented
AR0057 # 07 Y:1995 07 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $73,586 $1,500 Implemented
AR0057 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,333 $0 Implemented
AR0057 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,881 $17 Implemented