IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2426 Hardwood Dimension & Flooring Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0548 # 13 Y:2017 13 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $260 $850 Implemented
WV0548 # 12 Y:2017 12 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $863 $431 Implemented
WV0548 # 11 Y:2017 11 2017 DEVELOP A REPAIR/REPLACE POLICY $1,024 $699 Implemented
WV0548 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,545 $8,388 Implemented
WV0548 # 06 Y:2017 06 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,443 $1,000 Implemented
WV0548 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,331 $0 Implemented
WV0548 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,922 $41,392 Implemented
WV0386 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,790 $0 Implemented
WV0386 # 12 Y:2008 12 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $884 $1,000 Implemented
WV0386 # 11 Y:2008 11 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,548 $50 Implemented
WV0386 # 10 Y:2008 10 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,621 $1,000 Implemented
WV0386 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,379 $396 Implemented
WV0386 # 07 Y:2008 07 2008 DEVELOP A REPAIR/REPLACE POLICY $2,823 $769 Implemented
WV0386 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $4,653 $920 Implemented
WV0386 # 01 Y:2008 01 2008 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $140,425 $517,666 Implemented
WV0201 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $132 $180 Implemented
WV0201 # 12 Y:2000 12 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,057 $500 Implemented
WV0201 # 11 Y:2000 11 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,887 $40 Implemented
WV0201 # 09 Y:2000 09 2000 INSULATE BARE EQUIPMENT $922 $278 Implemented
WV0201 # 08 Y:2000 08 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,068 $300 Implemented
WV0201 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,718 $60 Implemented
WV0201 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,544 $240 Implemented
WV0201 # 04 Y:2000 04 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,675 $800 Implemented