IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

536

matching recommendations
Reset
SIC 2426 Hardwood Dimension & Flooring Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0223 # 01 Y:2003 01 2003 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $33,740 $0 Not Implemented
MS0223 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,538 $8,188 Implemented
MS0223 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,532 $411 Implemented
MS0223 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,878 $4,320 Not Implemented
MS0223 # 05 Y:2003 05 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,829 $3,710 Not Implemented
MS0223 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,537 $1,000 Implemented
MS0223 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,081 $355 Not Implemented
MS0223 # 08 Y:2003 08 2003 INSTALL TIMERS AND/OR THERMOSTATS $400 $355 Implemented
NC0247 # 01 Y:2002 01 2002 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $44,473 $120,000 Implemented
NC0247 # 02 Y:2002 02 2002 INSTALL SKYLIGHTS $1,646 $540 Implemented
NC0247 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,600 $2,665 Implemented
NC0247 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $591 $1,597 Not Implemented
NC0247 # 05 Y:2002 05 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,011 $7,795 Not Implemented
NC0247 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $100 Implemented
NC0247 # 07 Y:2002 07 2002 DEVELOP A REPAIR/REPLACE POLICY $774 $863 Implemented
NC0247 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,850 $1,004 Implemented
NC0247 # 09 Y:2002 09 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $860 $500 Implemented
ME0292 # 01 Y:2000 01 2000 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $13,365 $13,000 Not Implemented
ME0292 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,056 $26,450 Not Implemented
ME0292 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,527 $9,000 Not Implemented
ME0292 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,822 $340 Implemented
ME0292 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,944 $5,571 Not Implemented
ME0292 # 06 Y:2000 06 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,025 $1,373 Not Implemented
ME0292 # 07 Y:2000 07 2000 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $827 $250 Not Implemented
ME0292 # 08 Y:2000 08 2000 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $310 $240 Implemented