Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
536
matching recommendationsSIC | 2426 | Hardwood Dimension & Flooring Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0223 # 01 Y:2003 | 01 | 2003 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $33,740 | $0 | Not Implemented |
MS0223 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,538 | $8,188 | Implemented |
MS0223 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,532 | $411 | Implemented |
MS0223 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,878 | $4,320 | Not Implemented |
MS0223 # 05 Y:2003 | 05 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,829 | $3,710 | Not Implemented |
MS0223 # 06 Y:2003 | 06 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,537 | $1,000 | Implemented |
MS0223 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,081 | $355 | Not Implemented |
MS0223 # 08 Y:2003 | 08 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $400 | $355 | Implemented |
NC0247 # 01 Y:2002 | 01 | 2002 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $44,473 | $120,000 | Implemented |
NC0247 # 02 Y:2002 | 02 | 2002 | INSTALL SKYLIGHTS | $1,646 | $540 | Implemented |
NC0247 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,600 | $2,665 | Implemented |
NC0247 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $591 | $1,597 | Not Implemented |
NC0247 # 05 Y:2002 | 05 | 2002 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $10,011 | $7,795 | Not Implemented |
NC0247 # 06 Y:2002 | 06 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $427 | $100 | Implemented |
NC0247 # 07 Y:2002 | 07 | 2002 | DEVELOP A REPAIR/REPLACE POLICY | $774 | $863 | Implemented |
NC0247 # 08 Y:2002 | 08 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,850 | $1,004 | Implemented |
NC0247 # 09 Y:2002 | 09 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $860 | $500 | Implemented |
ME0292 # 01 Y:2000 | 01 | 2000 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $13,365 | $13,000 | Not Implemented |
ME0292 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,056 | $26,450 | Not Implemented |
ME0292 # 03 Y:2000 | 03 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,527 | $9,000 | Not Implemented |
ME0292 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,822 | $340 | Implemented |
ME0292 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,944 | $5,571 | Not Implemented |
ME0292 # 06 Y:2000 | 06 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,025 | $1,373 | Not Implemented |
ME0292 # 07 Y:2000 | 07 | 2000 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $827 | $250 | Not Implemented |
ME0292 # 08 Y:2000 | 08 | 2000 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $310 | $240 | Implemented |