IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

536

matching recommendations
Reset
SIC 2426 Hardwood Dimension & Flooring Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0215 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $15,764 $1,150 Implemented
TT0215 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,605 $163,091 Not Implemented
TT0215 # 01 Y:2019 01 2019 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $84,000 $369,200 Not Implemented
TT0201 # 15 Y:2017 15 2017 INSTALL TIMERS AND/OR THERMOSTATS $87 $100 Not Implemented
TT0201 # 14 Y:2017 14 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $802 $1,700 Not Implemented
TT0201 # 13 Y:2017 13 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,150 $3,500 Not Implemented
TT0201 # 12 Y:2017 12 2017 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,035 $1,000 Not Implemented
TT0201 # 11 Y:2017 11 2017 DEVELOP A REPAIR/REPLACE POLICY $3,298 $8,481 Not Implemented
TT0201 # 10 Y:2017 10 2017 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $3,329 $15,000 Not Implemented
TT0201 # 09 Y:2017 09 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,818 $23,900 Not Implemented
TT0201 # 08 Y:2017 08 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,271 $3,000 Not Implemented
TT0201 # 07 Y:2017 07 2017 UPGRADE OBSOLETE EQUIPMENT $12,087 $360 Not Implemented
TT0201 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,682 $26,000 Not Implemented
TT0201 # 05 Y:2017 05 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,888 $10,000 Not Implemented
TT0201 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,588 $126,000 Not Implemented
TT0201 # 03 Y:2017 03 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $36,301 $12,000 Not Implemented
TT0201 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130,717 $332,125 Not Implemented
TT0201 # 01 Y:2017 01 2017 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $339,254 $1,500,000 Not Implemented
UA0182 # 09 Y:2017 09 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,563 $4,224 Implemented
UA0182 # 08 Y:2017 08 2017 HEAT WATER WITH EXHAUST HEAT $10,960 $97,000 Not Implemented
UA0182 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,400 $500 Not Implemented
UA0182 # 06 Y:2017 06 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $8,680 $3,125 Implemented
UA0182 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,749 $2,465 Implemented
UA0182 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,371 $5,551 Not Implemented
UA0182 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,380 $8,066 Implemented