Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsSIC | 2426 | Hardwood Dimension & Flooring Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0201 # 05 Y:2017 | 05 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $19,888 | $10,000 | Not Implemented |
TT0201 # 15 Y:2017 | 15 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $87 | $100 | Not Implemented |
TT0201 # 14 Y:2017 | 14 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $802 | $1,700 | Not Implemented |
TT0201 # 13 Y:2017 | 13 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,150 | $3,500 | Not Implemented |
TT0201 # 12 Y:2017 | 12 | 2017 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,035 | $1,000 | Not Implemented |
TT0201 # 11 Y:2017 | 11 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $3,298 | $8,481 | Not Implemented |
TT0201 # 10 Y:2017 | 10 | 2017 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $3,329 | $15,000 | Not Implemented |
TT0201 # 09 Y:2017 | 09 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,818 | $23,900 | Not Implemented |
TT0201 # 08 Y:2017 | 08 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,271 | $3,000 | Not Implemented |
TT0201 # 07 Y:2017 | 07 | 2017 | UPGRADE OBSOLETE EQUIPMENT | $12,087 | $360 | Not Implemented |
TT0201 # 06 Y:2017 | 06 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,682 | $26,000 | Not Implemented |
TT0201 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,588 | $126,000 | Not Implemented |
TT0201 # 03 Y:2017 | 03 | 2017 | INCREASE AMOUNT OF CONDENSATE RETURNED | $36,301 | $12,000 | Not Implemented |
TT0201 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $130,717 | $332,125 | Not Implemented |
TT0201 # 01 Y:2017 | 01 | 2017 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $339,254 | $1,500,000 | Not Implemented |
UA0182 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,400 | $500 | Not Implemented |
UA0182 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $32,696 | $2,784 | Implemented |
UA0182 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,380 | $8,066 | Implemented |
UA0182 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,371 | $5,551 | Not Implemented |
UA0182 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,749 | $2,465 | Implemented |
UA0182 # 06 Y:2017 | 06 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,680 | $3,125 | Implemented |
UA0182 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $113,456 | $170,734 | Not Implemented |
UA0182 # 08 Y:2017 | 08 | 2017 | HEAT WATER WITH EXHAUST HEAT | $10,960 | $97,000 | Not Implemented |
UA0182 # 09 Y:2017 | 09 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,563 | $4,224 | Implemented |
WV0548 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,545 | $8,388 | Implemented |