IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0464 # 05 Y:2016 05 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,107 $7,900 Implemented
UM0464 # 04 Y:2016 04 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $736 $150 Implemented
UM0464 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,786 $3,794 Implemented
UD0915 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,815 $100 Implemented
UD0915 # 03 Y:2014 03 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,714 $1,800 Implemented
UD0915 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,184 $1,200 Implemented
UD0915 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,262 $0 Implemented
WV0430 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,692 $37,460 Implemented
WV0430 # 04 Y:2011 04 2011 UPGRADE CONTROLS ON COMPRESSORS $34,733 $26,650 Implemented
WV0430 # 02 Y:2011 02 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $43,659 $3,500 Implemented
WV0381 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,296 $19,992 Implemented
WV0381 # 05 Y:2008 05 2008 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $28,475 $76,200 Implemented
WV0381 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $25,696 $34,550 Implemented
WV0381 # 07 Y:2008 07 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,395 $2,100 Implemented
WV0381 # 08 Y:2008 08 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,259 $25,425 Implemented
WV0381 # 11 Y:2008 11 2008 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $7,681 $10,660 Implemented
WV0381 # 12 Y:2008 12 2008 INSTALL SET-BACK TIMERS $6,981 $1,150 Implemented
UD0544 # 10 Y:1998 10 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $769 $0 Implemented
UD0544 # 09 Y:1998 09 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $922 $700 Implemented
UD0544 # 07 Y:1998 07 1998 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $2,054 $0 Implemented
UD0544 # 06 Y:1998 06 1998 REPAIR FAULTY LOUVERS AND DAMPERS $2,092 $400 Implemented
UD0544 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,145 $1,000 Implemented
UD0544 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,427 $1,000 Implemented
UD0544 # 03 Y:1998 03 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $8,392 $0 Implemented
UD0544 # 01 Y:1998 01 1998 USE MORE EFFICIENT ADHESIVE APPLICATORS $15,189 $500 Implemented