Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,511
matching recommendationsSIC | 243 | Millwork, Plywood & Structural |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0091 # 04 Y:2017 | 04 | 2017 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $24,685 | $3,100 | Not Implemented |
UK1609 # 01 Y:2016 | 01 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $54,548 | $0 | Not Implemented |
UK1609 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,223 | $3,000 | Implemented |
UK1609 # 03 Y:2016 | 03 | 2016 | INSULATE FEEDWATER TANK | $380 | $140 | Not Implemented |
UK1609 # 04 Y:2016 | 04 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $657 | $0 | Implemented |
BS0088 # 01 Y:2016 | 01 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,541 | $11,782 | Not Implemented |
BS0088 # 02 Y:2016 | 02 | 2016 | LOWER OPERATING PRESSURE OF CONDENSER (STEAM) | $64,374 | $480 | Not Implemented |
BS0088 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,994 | $29,692 | Not Implemented |
BS0080 # 01 Y:2016 | 01 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,244 | $1,250 | Implemented |
BS0080 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,443 | $736 | Implemented |
BS0080 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $414 | $196 | Not Implemented |
BS0080 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,926 | $8,600 | Not Implemented |
BS0080 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $560 | $500 | Implemented |
BS0080 # 06 Y:2016 | 06 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $264 | $417 | Implemented |
BS0080 # 07 Y:2016 | 07 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,626 | $8,468 | Not Implemented |
UA0163 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42,679 | $9,795 | Implemented |
UA0163 # 02 Y:2016 | 02 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,730 | $500 | Not Implemented |
UA0163 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54,002 | $184,407 | Not Implemented |
UA0163 # 04 Y:2016 | 04 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $8,072 | $23,240 | Not Implemented |
UA0163 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,032 | $900 | Implemented |
UM0464 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $361 | $2,000 | Not Implemented |
UM0464 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,842 | $5,500 | Not Implemented |
UM0464 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,786 | $3,794 | Implemented |
UM0464 # 04 Y:2016 | 04 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $736 | $150 | Implemented |
UM0464 # 05 Y:2016 | 05 | 2016 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,107 | $7,900 | Implemented |