Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,511
matching recommendationsSIC | 243 | Millwork, Plywood & Structural |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0530 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $620 | $730 | n/a |
KU0530 # 04 Y:1999 | 04 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $55,080 | $1,380 | n/a |
KU0530 # 05 Y:1999 | 05 | 1999 | IMPROVE SPACE COMFORT CONDITIONING | $11,600 | $10,670 | n/a |
ND0335 # 01 Y:1999 | 01 | 1999 | DEVELOP A REPAIR/REPLACE POLICY | $13,184 | $31,164 | Implemented |
ND0335 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,904 | $9,101 | Implemented |
ND0335 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $511 | $1,603 | Implemented |
ND0335 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $477 | $430 | Implemented |
ND0335 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $272 | $120 | Implemented |
ND0335 # 06 Y:1999 | 06 | 1999 | USE OPTIMUM TEMPERATURE | $78 | $10 | Implemented |
ND0335 # 07 Y:1999 | 07 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $51 | $50 | Implemented |
AS0260 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,960 | $8,259 | n/a |
AS0260 # 02 Y:1999 | 02 | 1999 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,591 | $1,300 | n/a |
AS0260 # 03 Y:1999 | 03 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,200 | $7,600 | n/a |
AS0260 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $423 | $60 | n/a |
AS0260 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,157 | $240 | n/a |
AS0260 # 06 Y:1999 | 06 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $4,639 | $1,060 | n/a |
AS0260 # 07 Y:1999 | 07 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,300 | $30 | n/a |
AS0260 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $970 | $0 | n/a |
CO0447 # 01 Y:1999 | 01 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,160 | $5,000 | Implemented |
CO0447 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,270 | $660 | Implemented |
CO0447 # 03 Y:1999 | 03 | 1999 | REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER | $2,250 | $1,100 | Not Implemented |
CO0447 # 04 Y:1999 | 04 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $170 | $0 | Not Implemented |
CO0447 # 05 Y:1999 | 05 | 1999 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $80,060 | $200,000 | Implemented |
CO0447 # 06 Y:1999 | 06 | 1999 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $29,130 | $30,000 | Not Implemented |
IA0225 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,393 | $381 | Implemented |