IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0738 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $228 $200 Implemented
CO0738 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $319 $292 Not Implemented
CO0738 # 02 Y:2021 02 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,613 $2,285 Implemented
CO0738 # 01 Y:2021 01 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $33,173 $307,768 Not Implemented
CO0706 # 05 Y:2015 05 2015 USE SOLAR HEAT TO HEAT MAKE-UP AIR $1,490 $9,550 Not Implemented
CO0706 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,210 $57,920 Implemented
CO0706 # 03 Y:2015 03 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,400 $1,670 Not Implemented
CO0706 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,510 $1,200 Implemented
CO0706 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,710 $28,880 Not Implemented
CO0447 # 06 Y:1999 06 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $29,130 $30,000 Not Implemented
CO0447 # 05 Y:1999 05 1999 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $80,060 $200,000 Implemented
CO0447 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $170 $0 Not Implemented
CO0447 # 03 Y:1999 03 1999 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $2,250 $1,100 Not Implemented
CO0447 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,270 $660 Implemented
CO0447 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,160 $5,000 Implemented
CO0410 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $136 $598 Not Implemented
CO0410 # 05 Y:1998 05 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $1,700 $1,500 Implemented
CO0410 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,500 $23,420 Implemented
CO0410 # 03 Y:1998 03 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $220 $0 Not Implemented
CO0410 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $330 $480 Not Implemented