IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

90

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0407 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $744 $2,000 Not Implemented
AS0407 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $989 $2,000 Not Implemented
AS0407 # 02 Y:2005 02 2005 USE SOLAR HEAT TO HEAT WATER $1,251 $3,200 Not Implemented
AS0407 # 01 Y:2005 01 2005 INSTALL EQUIPMENT TO MOVE PRODUCT $257,790 $218,456 Not Implemented
CO0576 # 06 Y:2005 06 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,670 $9,240 Not Implemented
CO0576 # 01 Y:2005 01 2005 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES $84,000 $30,670 Not Implemented
CO0576 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,540 $190 Implemented
CO0576 # 04 Y:2005 04 2005 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $200 $170 Implemented
CO0576 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $920 $1,440 Not Implemented
CO0576 # 02 Y:2005 02 2005 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,450 $0 Not Implemented
CO0576 # 05 Y:2005 05 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,190 $17,170 Not Implemented
CO0576 # 07 Y:2005 07 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,740 $980 Not Implemented
OR0489 # 01 Y:2005 01 2005 UPGRADE CONTROLS ON COMPRESSORS $19,500 $5,400 Not Implemented
OR0489 # 11 Y:2005 11 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $8,500 $22,000 Not Implemented
OR0489 # 09 Y:2005 09 2005 OPTIMIZE PLANT POWER FACTOR $2,090 $5,200 Not Implemented
OR0489 # 10 Y:2005 10 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $5,800 $12,000 Implemented
OR0489 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $1,800 $2,100 Implemented
OR0489 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $1,450 $3,590 Implemented
OR0489 # 05 Y:2005 05 2005 ADJUST VENTS TO MINIMIZE ENERGY USE $24,900 $12 Implemented
OR0489 # 06 Y:2005 06 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,100 $15,400 Not Implemented
OR0489 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $2,330 $100 Implemented
OR0489 # 03 Y:2005 03 2005 PURCHASE EQUIPMENT INSTEAD OF LEASING $80,000 $58,000 Not Implemented
OR0489 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,600 $340 Implemented
CO0575 # 03 Y:2005 03 2005 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $4,750 $1,150 Implemented
CO0575 # 02 Y:2005 02 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $62,190 $230,000 Not Implemented