Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,179
matching recommendationsSIC | 2431 | Millwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0036 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $688 | $0 | n/a |
NT0036 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,170 | $16,268 | n/a |
NT0036 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,972 | $5,609 | n/a |
NT0036 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,825 | $0 | n/a |
UW2408 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $61,411 | $421,830 | n/a |
UW2408 # 01 Y:2024 | 01 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $13,069 | $103,000 | n/a |
UW2408 # 10 Y:2024 | 10 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $145,176 | $144,799 | n/a |
UW2408 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $116,105 | $13,500 | n/a |
UW2408 # 07 Y:2024 | 07 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $34,834 | $133,560 | n/a |
UW2408 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,014 | $0 | n/a |
UW2408 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,306 | $2,080 | n/a |
UW2408 # 08 Y:2024 | 08 | 2024 | INSULATE FEEDWATER TANK | $2,901 | $290 | n/a |
UW2408 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $45,697 | $89,919 | n/a |
UW2408 # 06 Y:2024 | 06 | 2024 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $35,732 | $2,619 | n/a |
OR0785 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $4,224 | $1,583 | Not Implemented |
OR0785 # 01 Y:2023 | 01 | 2023 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,209,151 | $28,500 | Not Implemented |
OR0785 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $323 | $0 | Implemented |
OR0785 # 04 Y:2023 | 04 | 2023 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,475 | $16,140 | Not Implemented |
OR0785 # 03 Y:2023 | 03 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,141 | $4,510 | Not Implemented |
SU0543 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,574 | $129 | Not Implemented |
SU0543 # 02 Y:2023 | 02 | 2023 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,892 | $0 | Not Implemented |
SU0543 # 05 Y:2023 | 05 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $853 | $45 | Not Implemented |
SU0543 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,981 | $0 | Not Implemented |
SU0543 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $984 | $0 | Not Implemented |
SU0543 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,796 | $218 | Not Implemented |