Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,165
matching recommendationsSIC | 2431 | Millwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0785 # 04 Y:2023 | 04 | 2023 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,475 | $16,140 | n/a |
OR0785 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $323 | $0 | n/a |
OR0785 # 03 Y:2023 | 03 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,141 | $4,510 | n/a |
OR0785 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $4,224 | $1,583 | n/a |
OR0785 # 01 Y:2023 | 01 | 2023 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,209,151 | $28,500 | n/a |
SU0543 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,981 | $0 | n/a |
SU0543 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,574 | $129 | n/a |
SU0543 # 05 Y:2023 | 05 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $853 | $45 | n/a |
SU0543 # 08 Y:2023 | 08 | 2023 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $10,295 | $12,000 | n/a |
SU0543 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $984 | $0 | n/a |
SU0543 # 02 Y:2023 | 02 | 2023 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,892 | $0 | n/a |
SU0543 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,796 | $218 | n/a |
SU0543 # 10 Y:2023 | 10 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,021 | $4,746 | n/a |
SU0543 # 09 Y:2023 | 09 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $370 | $433 | n/a |
SU0543 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,187 | $205 | n/a |
UA0264 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,563 | $1,200 | Implemented |
UA0264 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,745 | $4,870 | Implemented |
UA0264 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,549 | $8,397 | Implemented |
UA0264 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $5,008 | $3,605 | Not Implemented |
UA0264 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,542 | $1,512 | Not Implemented |
UA0264 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,878 | $500 | Implemented |
IP0157 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,715 | $63 | Not Implemented |
IP0157 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,303 | $702 | Not Implemented |
IP0157 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,064 | $845 | Not Implemented |
IP0157 # 04 Y:2022 | 04 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $666 | $262 | Not Implemented |