Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,165

matching recommendations
Reset
SIC 2431 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0785 # 04 Y:2023 04 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,475 $16,140 n/a
OR0785 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $0 n/a
OR0785 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $3,141 $4,510 n/a
OR0785 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $4,224 $1,583 n/a
OR0785 # 01 Y:2023 01 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,209,151 $28,500 n/a
SU0543 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,981 $0 n/a
SU0543 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,574 $129 n/a
SU0543 # 05 Y:2023 05 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $853 $45 n/a
SU0543 # 08 Y:2023 08 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $10,295 $12,000 n/a
SU0543 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $984 $0 n/a
SU0543 # 02 Y:2023 02 2023 PAY BILLS ON TIME TO AVOID LATE FEES $1,892 $0 n/a
SU0543 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,796 $218 n/a
SU0543 # 10 Y:2023 10 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,021 $4,746 n/a
SU0543 # 09 Y:2023 09 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $370 $433 n/a
SU0543 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,187 $205 n/a
UA0264 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,563 $1,200 Implemented
UA0264 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,745 $4,870 Implemented
UA0264 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $9,549 $8,397 Implemented
UA0264 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $5,008 $3,605 Not Implemented
UA0264 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,542 $1,512 Not Implemented
UA0264 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,878 $500 Implemented
IP0157 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,715 $63 Not Implemented
IP0157 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,303 $702 Not Implemented
IP0157 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,064 $845 Not Implemented
IP0157 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $666 $262 Not Implemented