IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,179

matching recommendations
Reset
SIC 2431 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0145 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $5,157 $5,200 Not Implemented
NV0145 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,181 $3,707 Implemented
NV0145 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,220 $1,000 Implemented
NV0145 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,002 $27,320 Not Implemented
NV0145 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $9,039 $0 Not Implemented
NV0145 # 07 Y:1999 07 1999 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $13,552 $640 Implemented
NV0145 # 08 Y:1999 08 1999 MOVE PRODUCT USING MECHANICAL MEANS $31,460 $32,800 Implemented
NV0144 # 01 Y:1999 01 1999 USE OPTIMUM THICKNESS INSULATION $418 $788 Not Implemented
NV0144 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $6,393 $5,533 Not Implemented
NV0144 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,668 $800 Implemented
NV0142 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,150 $12,127 Implemented
NV0142 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $414 $270 Not Implemented
NV0142 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $525 $0 Implemented
NV0142 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,122 $30,600 Implemented
KU0530 # 01 Y:1999 01 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,910 $8,800 n/a
KU0530 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $900 $520 n/a
KU0530 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $620 $730 n/a
KU0530 # 04 Y:1999 04 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $55,080 $1,380 n/a
KU0530 # 05 Y:1999 05 1999 IMPROVE SPACE COMFORT CONDITIONING $11,600 $10,670 n/a
ND0335 # 01 Y:1999 01 1999 DEVELOP A REPAIR/REPLACE POLICY $13,184 $31,164 Implemented
ND0335 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,904 $9,101 Implemented
ND0335 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $511 $1,603 Implemented
ND0335 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $477 $430 Implemented
ND0335 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $272 $120 Implemented
ND0335 # 06 Y:1999 06 1999 USE OPTIMUM TEMPERATURE $78 $10 Implemented