IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 2431 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0264 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,542 $1,512 Not Implemented
UA0264 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $5,008 $3,605 Not Implemented
UA0264 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,563 $1,200 Implemented
UA0264 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $9,549 $8,397 Implemented
UA0264 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,878 $500 Implemented
UA0264 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,745 $4,870 Implemented
UA0228 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $100 $50 Not Implemented
UA0228 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $164 $419 Not Implemented
UA0228 # 03 Y:2020 03 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,337 $1,553 Not Implemented
UA0228 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,664 $11,337 Not Implemented
UA0228 # 01 Y:2020 01 2020 USE POWER DURING OFF-PEAK PERIODS $8,116 $100 Not Implemented
UA0176 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,859 $400 Not Implemented
UA0176 # 07 Y:2017 07 2017 MODIFY STARTUP/SHUTDOWN TIMES $1,804 $0 Not Implemented
UA0176 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,273 $2,645 Implemented
UA0176 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,678 $38,382 Not Implemented
UA0176 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,883 $34,772 Not Implemented
UA0176 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $9,077 $16,027 Implemented
UA0176 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $29,064 $1,800 Implemented
UA0001 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,286 $252 Not Implemented
UA0001 # 07 Y:2007 07 2007 RECOVER AND REUSE WASTE MATERIAL $6,000 $0 Not Implemented
UA0001 # 06 Y:2007 06 2007 MINIMIZE WATER USAGE $564 $1,110 Not Implemented
UA0001 # 05 Y:2007 05 2007 UTILIZE JOB COSTING SOFTWARE $31,200 $8,489 Not Implemented
UA0001 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,147 $3,013 Not Implemented
UA0001 # 03 Y:2007 03 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,151 $64 Not Implemented
UA0001 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,116 $3,113 Not Implemented