IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2431 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2408 # 10 Y:2024 10 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $145,176 $144,799 n/a
UW2408 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $61,411 $421,830 n/a
UW2408 # 08 Y:2024 08 2024 INSULATE FEEDWATER TANK $2,901 $290 n/a
UW2408 # 07 Y:2024 07 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $34,834 $133,560 n/a
UW2408 # 06 Y:2024 06 2024 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $35,732 $2,619 n/a
UW2408 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $45,697 $89,919 n/a
UW2408 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,306 $2,080 n/a
UW2408 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,014 $0 n/a
UW2408 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $116,105 $13,500 n/a
UW2408 # 01 Y:2024 01 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,069 $103,000 n/a
OR0686 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,115 $16,115 Not Implemented
OR0686 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,743 $500 Not Implemented
OR0686 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,155 $0 Not Implemented
OR0686 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,997 $1,200 Not Implemented
OR0686 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $5,219 $0 Not Implemented
OR0686 # 01 Y:2017 01 2017 DEVELOP STANDARD OPERATING PROCEDURES $181,947 $31,400 Not Implemented
OR0476 # 04 Y:2005 04 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $32,100 $47,900 Not Implemented
OR0476 # 03 Y:2005 03 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $9,028 $600 Implemented
OR0476 # 02 Y:2005 02 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,039,000 $1,200,000 Not Implemented
OR0476 # 01 Y:2005 01 2005 INSTALL SENSORS TO DETECT DEFECTS $59,097 $38,400 Not Implemented
OR0241 # 01 Y:1995 01 1995 ADD AREA LIGHTING SWITCHES $5,534 $0 Implemented
OR0241 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $334 $1,203 Implemented
OR0241 # 02 Y:1995 02 1995 UPGRADE CONTROLS ON COMPRESSORS $2,260 $300 Not Implemented