IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

443

matching recommendations
Reset
SIC 2434 Wood Kitchen Cabinets
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0005 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,804 $7,172 Implemented
UW0005 # 02 Y:2007 02 2007 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $15,876 $4,452 Implemented
UW0005 # 03 Y:2007 03 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,246 $1,162 Implemented
UW0005 # 04 Y:2007 04 2007 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $8,530 $1,852 Not Implemented
UW0005 # 05 Y:2007 05 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,388 $2,619 Implemented
UW0005 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $6,971 $17,098 Not Implemented
UW0005 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,766 $432 Implemented
UW0005 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,795 $398 Implemented
UW0005 # 09 Y:2007 09 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $354 $650 Not Implemented
UU0105 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $6,120 $8,220 Not Implemented
UU0105 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,370 $0 Not Implemented
UU0105 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,340 $3,385 Not Implemented
UU0105 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,620 $430 Not Implemented
UU0105 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $440 $170 Not Implemented
UU0105 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $3,000 $2,300 Not Implemented
UU0105 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,980 $4,365 Not Implemented
UU0105 # 08 Y:2006 08 2006 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $15,140 $40,000 Not Implemented
SF0291 # 03 Y:2004 03 2004 ADD AREA LIGHTING SWITCHES $9,569 $1,464 Implemented
SF0291 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,135 $222 Not Implemented
SF0291 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,810 $5,675 Implemented
SF0291 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,732 $78,810 Implemented
SF0291 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,676 $22,891 Not Implemented
SF0291 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $914 $3,294 Implemented
SF0291 # 09 Y:2004 09 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $37,955 $102,295 Not Implemented
WV0303 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,432 $0 Not Implemented