IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

425

matching recommendations
Reset
SIC 2434 Wood Kitchen Cabinets
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0303 # 02 Y:2004 02 2004 DEVELOP A REPAIR/REPLACE POLICY $8,151 $458 Implemented
WV0303 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,999 $3,622 Not Implemented
WV0303 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,262 $137 Not Implemented
WV0303 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,576 $8,537 Implemented
WV0303 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,414 $618 Implemented
WV0303 # 07 Y:2004 07 2004 USE SYNTHETIC LUBRICANT $1,981 $560 Implemented
WV0303 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,770 $236 Implemented
WV0303 # 09 Y:2004 09 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,586 $2,606 Not Implemented
WV0303 # 10 Y:2004 10 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,061 $414 Implemented
WV0303 # 11 Y:2004 11 2004 RECOVER WASTE HEAT FROM EQUIPMENT $816 $515 Implemented
WV0303 # 12 Y:2004 12 2004 INSTALL OCCUPANCY SENSORS $606 $2,422 Not Implemented
WV0303 # 13 Y:2004 13 2004 INSULATE BARE EQUIPMENT $171 $303 Implemented
WV0303 # 14 Y:2004 14 2004 RECOVER AND REUSE WASTE MATERIAL $24,000 $458 Not Implemented
SF0291 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,433 $0 Not Implemented
SF0291 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,113 $720 Implemented
SF0291 # 03 Y:2004 03 2004 ADD AREA LIGHTING SWITCHES $9,569 $1,464 Implemented
SF0291 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,135 $222 Not Implemented
SF0291 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,810 $5,675 Implemented
SF0291 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,732 $78,810 Implemented
SF0291 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,676 $22,891 Not Implemented
SF0291 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $914 $3,294 Implemented
SF0291 # 09 Y:2004 09 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $37,955 $102,295 Not Implemented
CO0548 # 01 Y:2004 01 2004 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $16,080 $1,150 Implemented
CO0548 # 02 Y:2004 02 2004 DISTILL CONTAMINATED SOLVENTS FOR REUSE $14,440 $12,420 Implemented
CO0548 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,940 $360 Implemented