Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
177
matching recommendationsSIC | 2435 | Hardwood Veneer And Plywood |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0548 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,882 | $9,900 | Implemented |
OR0548 # 04 Y:2009 | 04 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $15,295 | $0 | Implemented |
OR0548 # 02 Y:2009 | 02 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $47,605 | $128,300 | Implemented |
UF0416 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,708 | $1,477 | Implemented |
UF0416 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,217 | $0 | Implemented |
UF0416 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $70,300 | $53,500 | Implemented |
UF0416 # 01 Y:2008 | 01 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $950 | $4,000 | Implemented |
OR0468 # 10 Y:2004 | 10 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,800 | $26,600 | Implemented |
OR0468 # 09 Y:2004 | 09 | 2004 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $14,800 | $15,700 | Implemented |
OR0468 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,700 | $13,800 | Implemented |
OR0468 # 07 Y:2004 | 07 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,200 | $27,800 | Implemented |
OR0468 # 04 Y:2004 | 04 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $22,000 | $1,200 | Implemented |
OR0468 # 03 Y:2004 | 03 | 2004 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $3,000 | $0 | Implemented |
OR0468 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,200 | $9,200 | Implemented |
GT0765 # 01 Y:2003 | 01 | 2003 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $3,130 | $0 | Implemented |
GT0765 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,790 | $1,300 | Implemented |
GT0765 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,180 | $6,000 | Implemented |
AS0344 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,587 | $10,835 | Implemented |
AS0344 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,169 | $6,136 | Implemented |
AS0344 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $68 | $167 | Implemented |
AS0344 # 05 Y:2003 | 05 | 2003 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $82 | $356 | Implemented |
AS0344 # 04 Y:2003 | 04 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $473 | $21 | Implemented |
OR0426 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $41,000 | $41,000 | Implemented |
OR0426 # 03 Y:2003 | 03 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,720 | $1,000 | Implemented |
OR0426 # 07 Y:2003 | 07 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $199 | $0 | Implemented |